Similar Projects
Reconstruction of College Avenue - City of Carmel
Alteration
Conception
$250,000 est. value
Carmel, IN

Bridge Deck Overlay
Infrastructure
Conception
$1,741,840 CJ est. value
Rising Sun, IN 47040

Tailor Row
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Hammond, IN 46320

Northwest Elevated Storage Tank Rehabilitation Project
Infrastructure
Design
$1,395,900 CJ est. value
South Bend, IN 46601

Drainage Ditch Correction
Infrastructure
Conception
$528,000 CJ est. value
Paoli, IN 47454

2022-1 CCMG Community Crossings Paving Program Re-bid
Infrastructure
Design
$878,098 CJ est. value
Farmersburg, IN 47850

Norarrow Multifamily Housing
New Construction, Infrastructure - 270,880 SF
Conception
$80,000,000 CJ est. value
Fort Wayne, IN 46845

Isabelle Farms
New Construction, Infrastructure
Design
$90,000,000 CJ est. value
Shelbyville, IN 46176

New Bridge Tipton / Park Street over RR crossing
Infrastructure, Renovation
Conception
$6,098,880 CJ est. value
La Porte, IN 46350

2022 Taxiway Microsurface Project
Infrastructure
Design
$500,000 CJ est. value
Valparaiso, IN 46383

HMA Overlay Minor Structural
Infrastructure
Conception
$682,183 CJ est. value
Mooresville, IN 46158

3000 and 3070 S Walnut St Warehouse / Bloomington
New Construction, Infrastructure
Design
$1,500,000 CJ est. value
Bloomington, IN 47401

Sewer Improvements - County of Lake
Infrastructure
Conception
$25,000,000 est. value
Crown Point, IN

Auxiliary Lanes, Accel and Decel or Turn Lanes
Infrastructure
Design
$2,346,198 CJ est. value
Lafayette, IN 47905

Chessie Trail Phase II - City of La Porte
Infrastructure
Conception
$500,000 est. value
La Porte, IN

Last Updated 03/16/2023 11:12 AM
Project Title

Jennings County Decatur Mold Tool and Engineering Inc. and Decatur Plastic Products, Inc. Pump Station and Force Mains

Physical Address View project details and contacts
City, State (County) Vernon, IN 47282   (Jennings County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $4,100,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

If sealed Bids are to be mailed or sent via Commercial Carrier, they shall be sent to the Jennings County Auditor, and clearly marked for Decatur Mold Tool and Engineering, Inc. and Decatur Plastic Products, Ins. Pump Station and Force Mains Project, PO Box 383 Vernon, IN 47282 or delivered to the Jennings County Auditor, and clearly marked for Decatur Mold Tool and Engineering, Inc. and Decatur Plastic Products, Ins. Pump Station and Force Mains Project, 200 E Brown Street, Vernon, IN 47282. Question Deadline 03/10/2023 at 5:00 PM ET Bidders shall submit all questions to the Engineer in writing via email at: kdunn@hwcengineering.com Any questions received via email will be answered in the form of an Addendum submitted to all plan holders.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents