Similar Projects
Pascagoula High School Intercom Replacement
Renovation
Sub-Bidding
$850,000 CJ est. value
Pascagoula, MS 39567

2021 Contract Tracing / Security Camera Systems
Alteration
Post-Bid
Hattiesburg, MS

Procurement of Equipment for Totalcard Access Control System
Alteration
Post-Bid
Senatobia, MS

Install Lenel HSPD-12 Compliant Physical Access Control System (ePACS) - Poplarville, MS
Term Contract
Results
Poplarville, MS 39470

Fiber Optic Cable Installation to Various Facilities
Term Contract
Results
$500,000 to $1,000,000 est. value
Biloxi, MS 39534

Upgrade of Existing Cameras
Alteration
Post-Bid
Lorman, Natchez, Vicksburg, MS 39096

6515--Audiovisual System
Alteration
Results
Pensacola, FL - Biloxi, MS 32507

MGCCC Arena AV Package
Alteration
Post-Bid
Perkinston, MS 39573

Provide, Install, and Maintain 10GB Ethernet
Term Contract
Results
Pensacola, FL - Kiln, MS 32507

Telops Multispectral Infrared Camera and Accessories
Alteration
Post-Bid
University, MS

Intercom System Install
Alteration
Results
$168,886 est. value
Kiln, MS

2021 IP Phone District-Wide Project
Alteration
Post-Bid
MS

AV Upgrades
Alteration
Results
Fulton, MS

IP School Intercom Project
Alteration
Post-Bid
Tishomingo, MS

Sewer and Drainage Video Camera
Alteration
Results
$112,813 est. value
Pascagoula, MS

Last Updated 04/17/2023 08:20 AM
Project Title

Fiber Optic Cable Installation - ITB 230 to Building 99

Physical Address View project details and contacts
City, State (County) Columbus, MS 39705   (Lowndes County)
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor Shall engineer, furnish,install and test (EFI&T) 12-strand single mode (SM) fiber optic cables (FOC) from the information transfer building (ITB) 230 to Bldg. 99 at Columbus AFB, MS IAW the statement of work (SOW). The contractor will provide all equipment tools materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in the statement of work (SOW. The contractor(s) shall comply with the current TIA telecommunication installation and testing commercial standard and base installation standards. All Equipment, supplies, and materials provided shall be new and not refurbished. ------------------------------------------------------------------------------------------------------------------------ NOTE: When submitting your quote please follow the instructions listed at 52.212-1 (Instructions to Offerors) on Attachment 2 - Provisions and Clauses. Quotes shall be submitted via email to the following addresses (jon.bogaard.1@us.af.mil ; brian.gitau@us.af.mil) no later than 4:30pm CST, 14 April 2023 in order to be considered timely. Questions are due no later than 4:30 PM CST, 4 April 2023. The Government is not obligated to answer any questions submitted after the deadline. It is the vendor's responsibility to monitor the solicitation posted herein for amendments issued in reference to this requirement. Any potential amendments will be posted in the same fashion as the solicitation. All Contractors who provide goods/services to the DoD must be registered in the System for Award Management (SAM). Failure to comply with SAM registration will deem the Offeror ineligible for award. The contractor Shall engineer, furnish,install and test (EFI&T) 12-strand single mode (SM) fiber optic cables (FOC) from the information transfer building (ITB) 230 to Bldg. 99 at Columbus AFB, MS LAW the statement ofwork (SOW). The contractor will provide all equipment tools materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in the statement ofwork (SOW. The contractors) shall comply with the current TLA telecommunication installation and testing commercial standard and base installation standards. All Equipment, supplies, and materials provided shall be new and not refurbished.

Details

Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents