Similar Projects
Z--CHOH 151201 McMahons Mill to Lock 42
Design
$5,000,000 to $10,000,000 est. value
Williamsport, MD 21795

Acid Mine Drainage System Maintenance Service Contract
Post-Bid
Frostburg, MD

Mistletoe Hall Farm Subdivision and Infrastructure Project
Post-Bid
$2,500,000 to $5,000,000 est. value
Easton, MD 21601

Watkins Mill Road-Travis Avenue Stream Restoration
Results
Gaithersburg, MD

Indian Acres Dam Repair
Results
Earleville, MD

Turkey Point Shoreline Management
Pending Verification
Edgewater, MD 21037

Providing Roadside and Drainage Maintenance for the Administration's Maintenance Shops Located in Anne Arundel County
Post-Bid
$1,000,000 to $2,500,000 est. value
MD

Back Road Repair
Results
$500,001 to $1,000,000 est. value
Sharpsburg, MD

CHOH 151201 Reconstruct/Stabilize Historic Stone Wall
Post-Bid
$5,000,000 to $10,000,000 est. value
Williamsport, MD

Construction Services Dorsey Avenue Drainage Improvements
Results
$502,697 est. value
Annapolis, MD 21401

Pipes and Structures Replacement Program for Storm Drains
Term Contract
Post-Bid
$2,500,001 to $5,000,000 est. value
Largo, MD 20774

Culvert Replacement - Station Road
Results
Newcomb, MD

Lagoon Weir Gate Installation
Post-Bid
Poolesville, MD

Construction of the Eisenhower Golf Course Stream Restoration
Results
Crownsville, MD

Calverton Channel Rehabilitation
Post-Bid
$2,500,001 to $5,000,000 est. value
Glenarden, MD 20774

Last Updated 10/02/2020 06:10 AM
Project Title

Slope Protection at MD 135 (Pratt Street) at Various Locations to US 220

Physical Address View project details and contacts
City, State (County) MD   (Allegany County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project, located in Allegany County, is for the construction of rockslide prevention devices at six separate locations along a portion of MD 135. Beginning east of MD 46 and extending in an Easterly direction towards Westernport for a total distance 3 miles.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents