Similar Projects
200 Central Office Building
Renovation - 295,000 SF
Design
$29,000,000 est. value
Saint Petersburg, FL 33701

Orange Station at the Edge
New Construction, Build-Out, Demolition - 122,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Saint Petersburg, FL 33701

Town Park Refurbishment
Renovation, Term Contract
Bidding
$121,000 est. value
Redington Beach, FL

Archibald ADA Restroom Improvements
Renovation
Bidding
Madeira Beach, FL 33708

Clearwater Center
Renovation
Post-Bid
Clearwater, FL 33764

Infrastructure, Streetscape, and Park Improvements to the 22nd Street South Corridor
Infrastructure
Post-Bid
Saint Petersburg, FL

Friendship Park Improvements
Results
$40,000 est. value
Redington Beach, FL 33708

Telescopic Bleacher Purchase and Installation at Forbes Recreation Center
Results
$31,415 est. value
Pinellas Park, FL 33782

Evergreen Village AKA Lincoln Village Supportive Housing
New Construction
Construction
$5,118,668 est. value
Pinellas Park, FL 33781

Massey Law Group
Renovation - 3,468 SF
Construction
Saint Petersburg, FL 33713

Avalon Apartments
New Construction
Pending Verification
Largo, FL 33778

Design Build Services, Sunken Gardens Children's Garden Exhibit
New Construction
Post-Bid
Saint Petersburg, FL

Waterfront Park Playground
Results
Less than $750,000 est. value
Seminole, FL

Imagine Clearwater Park Early Release Sitework Package
Construction
$10,000,000 est. value
Clearwater, FL

St. Petersburg College Vet Tech Dog Yard Renovation
Renovation
Post-Bid
Largo, FL 33774

Last Updated 11/16/2021 08:31 AM
Project Title

Repurposing of Former Blue Jays PDC

Physical Address View project details and contacts
City, State (County) Dunedin, FL 34698   (Pinellas County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Conversion of approximately a 29,790 square foot single story office building into a Park Maintenance Facility (Parks Operations Building). The conversion will affect approximately 19,168 square feet of the existing building. The rest of the building will remain as office space. Exterior features include site fencing, onsite pads for storage sheds, outside wash rack/pad, generator, and other work

Details

Office, New Construction, Park/Playground, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Selective Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents