Similar Projects
Boiler Replacement - MEP
Renovation
Sub-Bidding
$454,000 CJ est. value
Madison, WI 53715

MEPF Design Assist for East, West and Capital High Schools
Alteration
Post-Bid
Madison, WI 53704

Clarity Endcap Buildout
Renovation, Alteration
Post-Bid
Verona, WI 53593

HVAC Annual Preventative Maintenance
Results
Madison, WI 53704

BPHCC HVAC RTU Modifications
Alteration
Results
Verona, WI 53593

Air Compressor #3 Replacement - Walnut Street Heating Plant
Infrastructure
Construction
$87,597 CJ est. value
Madison, WI 53715

NWHC Replacement of Air Handling Unit - FS-06
Term Contract
Post-Bid
$250,000 to $500,000 est. value
Madison, WI

Food Service HVAC Improvements - GPC
Alteration
Results
$1,675,000 est. value
Madison, WI

Duct Cleaning Services
Alteration
Post-Bid
Chippewa Falls, Madison, Mauston, Oshkosh, Union Grove, WI 54901

SMO HVAC Replacement
Alteration
Results
Madison, WI 53713

Refurbish Marley Cooling Tower
Alteration
Post-Bid
Madison, WI 53704

Building One Air Conditioning Installation
Alteration
Results
$283,000 est. value
Madison, WI 53704

Valve Boxes
Term Contract
Post-Bid
Madison, WI

Portable Water Chiller
Term Contract
Results
Madison, WI 53726

Air Filtration Installation
Alteration
Post-Bid
$133,000 est. value
Sun Prairie, WI

Last Updated 12/20/2022 09:38 AM
Project Title

2021 HVAC Improvements Project

Physical Address View project details and contacts
City, State (County) Madison, WI 53713   (Dane County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $1,994,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: 1610 Moorland Road Madison, Wi 53713 The project includes improvements to the heating, ventilation, and air conditioning systems at the Nine Springs Wastewater Treatment Plant. Major components of the Project include the following: Remove existing air handling equipment at four separate structures. Install new air handling equipment and associated electrical and control equipment and devices. Modify the structure including new wall and roof openings are required to accommodate and support the new air handling equipment. All prime bidders and electrical and mechanical subcontractors must be qualified for this specific work. Before Proposals will be accepted for the work contemplated herein, the Owner will conduct such investigation as necessary to determine the performance record and ability of the prime bidders/subcontractors to perform the size and type of work specified in the Contract Documents. All questions regarding the project shall be directed to John Bembinster, Madison Metropolitan Sewerage District. Phone (608) 222-1201, x204, johnb@madsewer.org.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents