Similar Projects
4100 South Secondary Waterline Project
Post-Bid
Magna, UT 84044

Little Cottonwood Penstock Lining Repair
Post-Bid
Murray, UT 84107

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

2020 Utility Grade Adjustment
Results
West Jordan, UT 84088

Secondary Water Meter Installation
Post-Bid
South Jordan, UT 84095

City Creek Filter Media Replacement
Results
Less than $2,000,000 est. value
Salt Lake City, UT 84103

River Bottom Improvement Project Prequalification
Post-Bid

Lee Kay Fish Hatchery Water Quality Monitoring and Alarm System
Results
$20,000 to $30,000 est. value
Salt Lake City, UT 84148

2021 Deer Ridge Waterline Cathodic Protection
Infrastructure
Post-Bid
Draper, UT 84020

Rushton Groundwater Treatment Plant Filter Vessel
Results
Salt Lake City, UT 84170

Heritage Park Interactive Water Feature
Infrastructure
Post-Bid
South Jordan, UT 84095

Page Sharmel Water Improvements Project
Results
Less than $1,611,164 est. value
Salt Lake City, UT

Upper Conduit Repair - Construction Phase 1
Infrastructure
Post-Bid
$1,287,262 est. value
Salt Lake City, UT

Milford City Water Improvement Project
Results
Less than $5,000,000 est. value

Construction of the Redwood Road 2021 Improvements
Infrastructure
Post-Bid
Taylorsville, UT

Last Updated 02/14/2022 04:53 AM
Project Title

FY 19/20 Water Main Replacements

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84104   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,822,742
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project specific scope of work included performing sixteen vacuum excavations at two locations in Salt Lake City, Utah. The locations include 200 South at the UTA railroad crossing and the intersection of 3300 South and 700 East. The vacuum excavation locations were identified by the Client. The utilities targeted include communications, gas, and water facilities. Two sanitary sewer manholes and one storm manhole were also logged.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents