Similar Projects
Last Updated | 10/14/2021 06:17 PM |
Project Title | HMA Milling and Resurfacing |
Physical Address | View project details and contacts |
City, State (County) | Centralia, IL (Marion County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | HMA milling and resurfacing between 2nd St. and E. Noleman St., with an omission at Broadway, including sidewalk ramp reconstruction to meet ADA guidelines at 2nd St. 1. Bituminous Materials (Tack Coat) - 2877 Pound 2. Hma Bc Il-9.5fg n50 - 130 Ton 3. Hma Sc Il-9.5 c n50 - 472 Ton 4. Pc Conc Sidewalk 4 - 823 Sq Ft 5. Detectable Warnings - 60 Sq Ft 6. Hma Surface Removal, 1 1/2" - 5283 7. Curb Removal - 38 Foot 8. Sidwalk Removal - 763 Sq Ft 9. Pavement Patching, Type Ii, 6 Inch - 20 Sq Yd 10. Concrete Curb, Type b - 54 Foot 11. Mobilization - 1 l Sum 12. Hma Surf Rem Var Dp - 1705 Sq Yd 13. Traf Cont & Prot Spl - 1 l Sum |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |