Similar Projects
DFCM Construction - Mechanical - Payson VA Nursing Home Heat Pump Replacements
Results
$352,367 est. value
Payson, UT 84651

Drinking Water Well Rehabilitation
Results
Orem, UT

Well Rehabilitation for Edgemont Well
Results
Provo, UT 84604

Alpine City Cup Filter Station Project
Results
$495,539 est. value
Alpine, UT

2550 East Canyon Road Well Rebuild 2021
Term Contract
Results
$180,000 to $200,000 est. value
Spanish Fork, UT 84660

Lehi City Sand Pit Well Development
Alteration
Post-Bid
Lehi, UT

Drinking Water Well Rehabilitation - Well #6
Term Contract
Results
Orem, UT 84097

American Fork Hospital Well Redevelopment
Alteration
Results
$172,800 est. value
American Fork, UT 84003

Headquarters Well Evaluation & Rehabilitation
Term Contract
Post-Bid

American Fork 2021 Well Rehabilitation Projects
Infrastructure
Results
$1,133,631 est. value
American Fork, UT 84003

Well 7 Equipping
Infrastructure
Results
Saratoga Springs, UT 84045

Boulevard Well Project
Infrastructure
Post-Bid
Pleasant Grove, UT

DFCM Construction-Pre Qualified General-UVU Campus-Wide Central Plant 3 Well Improvements
Infrastructure
Bidding
$159,000 est. value
Orem, UT 84058

Pony Express Well-Site Release
Infrastructure
Bidding
Eagle Mountain, UT

White Hill Well Test Pumping
Infrastructure
Bidding
Eagle Mountain, UT

Reported 02/08/2022 01:41 PM
Project Title

Orem Well #10 And Well #1 Relocation Drilling Project

Physical Address View project details and contacts
City, State (County) Orem, UT 84058   (Utah County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Well #10 will be constructed on property and easements owned by the City of Orem at 400 South 400 West, Orem, Utah. The well will be drilled on the northeast corner of the existing lot. The relocated Well #1 will be constructed on property owned by the City at approximately 651 East 1400 South. The Project in general includes drilling and construction of two new public drinking water supply wells .

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents