Similar Projects
Student Activity Center Renovation - Auburn University
Renovation
Conception
$5,000,000 est. value
Auburn, AL 36849

New Aquaculture Barn - Auburn University
New Construction
Conception
Auburn, AL 36849

STEM Ag Sciences Complex - New Facility
New Construction
Design
$165,000,000 est. value
Auburn, AL

Jay and Susie Gogue Performing Arts Center - Auburn University
Addition
Design
$5,000,000 est. value
Auburn, AL 36832

Lowder Hall Financial Lab Renovations
Renovation - 4,218 SF
Bidding
$1,500,000 est. value
Auburn, AL 36849

Cares Act Upgrades at Three Campuses
New Construction
Post-Bid
Opelika, Valley, Wadley, AL 36801

Facilities Management Training Center - New Facility
New Construction - 9,600 SF
Post-Bid
Auburn, AL 36849

Southeastern Raptor Center - New Rehabilitation Mew
New Construction
Results
Auburn, AL 36849

Greene Hall - Room 128 Lab Renovations
Renovation
Results
Auburn, AL 36832

AU Hotel and Dixon Conference Center - Guest Rooms, Interior Refurbishments and Repairs
Renovation
Construction
Auburn, AL 36830

Comer Hall - Comprehensive Renovation (Phase I)
Renovation
Construction
$1,178,770 est. value
Auburn, AL 36849

Auburn University STEM+Ag Sciences Complex - New Facility
New Construction - 220,000 SF
Design
$36,000,000 est. value
Auburn, AL

Renovations to Southside Center for the Arts
Renovation
Post-Bid
Opelika, AL 36801

Claude Peteet Mariculture Center (Gulf Shores) - Modular Dormitory Building and Storm Shelter
New Construction
Results
Auburn, AL

Greene Hall - Room 130 Misc Structural Repairs
Renovation
Post-Bid
$500,000 est. value
Auburn, AL 36832

Reported 07/13/2022 12:00 AM
Project Title

Campus Wide - Job Order Contract (JOC) Program for General Works

Physical Address View project details and contacts
City, State (County) Auburn, AL   (Lee County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To implement a Job Order Contract (JOC) continuing contract also known as a Task Order Contract. Job Order Contracting is a quantity type of construction contract that will enable Auburn University to accomplish construction projects utilizing pre-determined (set) pricing with a contractor adjustment factor applied.

Details

College/University, New Construction.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents