Similar Projects
M15 Fuquay-Varina Middle School
Renovation
Design
Fuquay-Varina, NC

H12 New High School
New Construction
Design
Less than $152,291,274 est. value
Apex, NC 27539

General Construction and Repair - Central Region
Bidding
Raleigh, NC

General Construction and Repair - East Region
Term Contract
Bidding
Raleigh, NC

West Millbrook Middle School Project
New Construction - 250,000 SF
Post-Bid
Raleigh, NC 27615

Elevator Installation and Repair
Term Contract
Post-Bid
Raleigh, NC 27610

CM at Risk Selection - Two New Elementary Schools, One New High School, and One Middle School Renovation/Replacement
Renovation
Results
NC

IAQ General Contracting
Term Contract
Results
NC

Fuquay-Varina High School
New Construction
Construction
Fuquay-Varina, NC

Herbert Akins Road Middle School(M-14)
New Construction - 170,000 SF
Construction
Fuquay-Varina, NC 27526

General Construction and Repair - North Region
Term Contract
Bidding
Raleigh, NC

Lineberry Hall Auditorium
Renovation
Post-Bid
Raleigh, NC 27606

Modular Unit Renovations - Carroll Middle School Site Renovations - Fox Road Elementary School
Renovation
Results
Raleigh, NC 27609

General Construction and Repair - South Region
Term Contract
Bidding
Raleigh, NC

Two Elementary School Renovation/Replacements, One New Elementary School, One New Middle School with High School Component, and One 6-12 Alternative Learning Program School
Renovation
Post-Bid
Cary, NC 27519

Last Updated 11/06/2019 01:57 PM
Project Title

South Garner High School AG Mech Retrofit

Physical Address View project details and contacts
City, State (County) Garner, NC 27529   (Wake County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of selective demolition and disposal of existing equipment, painting, epoxy floor coating, pneumatic piping, electrical modifications, HVAC and exhaust fan modification/installation including integration with building BAS, and installation of owner supplied welders, welding booths, fume extractors, and fume extraction duct work.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents