Similar Projects
Adler Road Reconstruction
Renovation - 4,118 SF
Post-Bid
$25,000 to $100,000 est. value
Ashland, WI 54855

Crackfilling
Post-Bid
De Pere, WI

Lacrosse - Westby, Brickyard Lane to CTH M
Results
La Crosse, Westby, WI 54602

Lacrosse - Westby, Brickyard Lane to CTH M
Results
La Crosse, Westby, WI 54602

Rehabilitate Burma Road
Post-Bid
$7,500,000 to $10,000,000 est. value
Fort McCoy, WI

Star Prairie - Osceola, Scl to Cth Y
Results
Osceola, Star Prairie, WI

Paving Work
Results
Lyndon Station, WI

2021 Street Projects 47
Results
Less than $2,000,000 est. value
Oconomowoc, WI

Lancaster - Platteville, Ush 61 To E. Jct. Old Lancaster Road
Results
Lancaster, Platteville, WI

Madison - Lake Mills, Cth A, B-28-41, Airport Road,
Results
WI

C. Janesville, E. Racine Street, S. Randall Avenue Intersection
Results
WI

City Of Waupun, S. Madison Street, Doty Street To E. Lincoln Street
Results
WI

Minong - Solon Springs, Sth 77 Intersection
Results
Minong, WI

Eau Claire, N. Clairemont Avenue, Sth 312 To County Line Road
Results
Eau Claire, WI 54701

Zoo Freeway, Burleigh Street To Good Hope Road
Results
WI

Reported 05/29/2022 12:00 AM
Project Title

Roadwork

Physical Address View project details and contacts
City, State (County) Monroe, WI   (Green County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Bid is to: Pave a 21' wide road in two lifts using 3LT at 2.25" on the first lift and 4LT at 2.25" on the final lift. The shoulders would be 2' on each side. Pulverize 3,870' of roadway, shape, compact and overlay with hot mix asphalt in two lifts with final compaction of 4.5". Apply a tack oil coat between lifts. A two week separation between the two lifts being applied is needed. All roadwork must be completed by 9/1/22. The Town reserves the right to reject any and/or all bids and to select any bid deemed to be the most advantageous to the Town. A current Certificate of Insurance must accompany all bids.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents