Similar Projects
Last Updated | 11/22/2022 06:04 AM |
Project Title | Highland Park Lamberton Conservatory Boiler System Replacement |
Physical Address | View project details and contacts |
City, State (County) | Rochester, NY 14620 (Monroe County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $228,500 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For Lamberton Conservatory Boiler System Replacement The work to be performed consists principally of the furnishing of all labor and materials for: replacing the Lamberton Conservatory's boiler systems, including pumps and controls. The work consists of mechanical, electrical and general building construction work necessary and required for completing the installation work and providing an operational boiler heating system. The foregoing is a general outline of work only and shall not be construed as a complete description of the work to be performed under the Contract. Requests for interpretations shall be made in writing no later than the end of business on November 10, 2022. . Contract No. 1; Mechanical Construction. a. Contract No. 1: Mechanical Construction will have the primary responsibility for coordinating the work of Contract Nos. 1, 2 and 3. This includes scheduling and coordinating their work and the work of other trades, including other Prime Contractors of this project and /or Monroe County work crews, or Contractors under contract by the Owner to complete Electrical and General Construction work on this project. Coordination activities shall include, but are not limited to, shared access to workspaces, interruptions to permanent and temporary utilities, construction schedule updates, and completion of interrelated punch list items. b. Contract No. 1: Mechanical Construction consists of all work shown, specified and required to complete the project, including work specified in Division 01 and Division 23, and the Mechanical Contract Drawings unless otherwise noted. 2. Contract No. 2; Electrical Construction consists of all work shown, specified and required to complete the project, including work specified in Division 01 and Division 26, and the Electrical Contract Drawings, unless otherwise noted. 3. Contract No. 3; General Construction. consists of all work shown, specified and required to complete the project, including any building work related to a) removal/demolition and replacement of Portland cement concrete equipment pads; b) furnishing and installing concrete block masonry units and appurtenances, and c) trench excavation, backfill and floor surface restoration for a condensate drain; all as specified in Divisions 01, 23 and 26; and the Mechanical Contract Drawings unless otherwise noted. MECHANICAL -Landry Mechanical Contractors, Inc- 203,800.00 Electrical - Schuler - Haas Electric Corp -$24,700.00 GENERAL - Michael A Ferrauilo |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |