Similar Projects
Furnish and Deliver New Gas Heating Make Up Air Units
Term Contract
Sub-Bidding
Rochester, NY 14617

Heat Pumps
Alteration
Post-Bid
Rochester, NY

HVAC & Refrigeration Replacement & Maintenance For Lukoil Service Stations
Alteration
Post-Bid

Cooling Tower Media Replacement
Alteration
Results
Rochester, NY 14623

AERCO Boiler Replacement at Hudson Ridge Tower
Alteration
Results
Rochester, NY 14621

HVAC
Alteration
Post-Bid

Furnish and Install Two Air Handlers in NWQ
Alteration
Results
Hilton, NY 14468

Hvac Equipment Maintenance And Related Services
Term Contract
Post-Bid

Furnish and Install Two Air Handlers in FEV
Alteration
Results
Rochester, NY 14617

ROC ATCT Base Building HVAC Upgrade
Alteration
Post-Bid
$250,000 est. value
Rochester, NY 14624

Cooperative HVAC Repair, Maintenance and Installation Service
Term Contract
Results
NY

Furnish and Deliver Four (4) Rooftop Heating and Cooling Units
Alteration
Post-Bid
Rochester, NY 14624

HVAC Air Filters
Term Contract
Results
NY

IT Room HVAC Replacement
Alteration
Post-Bid
Rochester, NY 14620

Monroe County Office Building HVAC Upgrades
Renovation
Results
$10,512,700 CJ est. value
Rochester, NY 14614

Last Updated 11/22/2022 06:04 AM
Project Title

Highland Park Lamberton Conservatory Boiler System Replacement

Physical Address View project details and contacts
City, State (County) Rochester, NY 14620   (Monroe County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $228,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For Lamberton Conservatory Boiler System Replacement The work to be performed consists principally of the furnishing of all labor and materials for: replacing the Lamberton Conservatory's boiler systems, including pumps and controls. The work consists of mechanical, electrical and general building construction work necessary and required for completing the installation work and providing an operational boiler heating system. The foregoing is a general outline of work only and shall not be construed as a complete description of the work to be performed under the Contract. Requests for interpretations shall be made in writing no later than the end of business on November 10, 2022. . Contract No. 1; Mechanical Construction. a. Contract No. 1: Mechanical Construction will have the primary responsibility for coordinating the work of Contract Nos. 1, 2 and 3. This includes scheduling and coordinating their work and the work of other trades, including other Prime Contractors of this project and /or Monroe County work crews, or Contractors under contract by the Owner to complete Electrical and General Construction work on this project. Coordination activities shall include, but are not limited to, shared access to workspaces, interruptions to permanent and temporary utilities, construction schedule updates, and completion of interrelated punch list items. b. Contract No. 1: Mechanical Construction consists of all work shown, specified and required to complete the project, including work specified in Division 01 and Division 23, and the Mechanical Contract Drawings unless otherwise noted. 2. Contract No. 2; Electrical Construction consists of all work shown, specified and required to complete the project, including work specified in Division 01 and Division 26, and the Electrical Contract Drawings, unless otherwise noted. 3. Contract No. 3; General Construction. consists of all work shown, specified and required to complete the project, including any building work related to a) removal/demolition and replacement of Portland cement concrete equipment pads; b) furnishing and installing concrete block masonry units and appurtenances, and c) trench excavation, backfill and floor surface restoration for a condensate drain; all as specified in Divisions 01, 23 and 26; and the Mechanical Contract Drawings unless otherwise noted. MECHANICAL -Landry Mechanical Contractors, Inc- 203,800.00 Electrical - Schuler - Haas Electric Corp -$24,700.00 GENERAL - Michael A Ferrauilo

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents