Similar Projects
SLBE - E. 101st St. from Tracy to Forest Ave
Infrastructure
Bidding
Kansas City, MO

Asphalt Overlay and Curb Replacement
Renovation, Infrastructure - 81,742 SF
Bidding
Pevely, MO

Repave Streetscape at Justice Center
Post-Bid
Ballwin, MO 63011

2021 Mill and Overlay Program
Post-Bid
Gladstone, MO

Highway 210 and Walker Road Intersection Improvements
Results
North Kansas City, MO

2021 - Subdivision Asphalt Overlay
Results
$146,500 est. value
MO

2021 Crack Sealing Project
Infrastructure
Bidding
Chesterfield, MO

2021 Road Improvements
Post-Bid
Indian Point, MO

Asphalt Overlay Improvements
Results
University City, MO

Paseo Gateway Intersection
Infrastructure
Bidding
Kansas City, MO

Sidewalk Removal and Replacement
Alteration
Post-Bid
Potosi, MO 63664

Pavement Repairs at District Transportation Building
Results
Grandview, MO 64030

Washington County Industrial Park Roadway Improvements
Infrastructure
Bidding
Potosi, MO

2021 Asphalt Pavement Improvement
Infrastructure
Post-Bid
Jackson, MO

2021 Road Repairs
Infrastructure
Results
Kearney, MO

Last Updated 09/18/2021 04:05 AM
Project Title

Resurface on Route WW and on Route FF

Physical Address View project details and contacts
City, State (County) (Crawford, Phelps Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $2,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job J5S3340 Route WW, FF CRAWFORD County. Resurface on Route WW and on Route FF, the total length of improvement being 7.175 miles.(2): Job J5S3394 Various Routes, CRAWFORD, PHELPS County. Resurface on Rte. BB from Rte. 8 to the end of state maintenance, on Rte. UU from I-44 south outer road to the end of state maintenance, on I-44 south outer road from Rte. ZZ to the Crawford County line and Rte. KK in Phelps County from Rte. 8 to the Crawford County line, the total length of improvement being 17.549 miles

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents