Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Wawa #8142 / Bethlehem
New Construction, Infrastructure - 5,585 SF
Design
$1,000,000 CJ est. value
Bethlehem, PA 18018

Wawa #8142 / Bethlehem
New Construction, Infrastructure - 5,585 SF
Design
$1,000,000 CJ est. value
Bethlehem, PA 18018

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Rebid - Colonial Bathroom Replacement at the Louise Moore Park
Demolition, New Construction, Infrastructure
Post-Bid
$80,000 CJ est. value
Easton, PA 18045

Snow Removal And Landscaping
Alteration
Post-Bid
Hellertown, PA 18055

20th Street Mill and Overlay
Infrastructure
Results
$48,955 est. value
Wilson, PA

2021 Road Program
Infrastructure
Results
$83,715 est. value
Wilson, PA 18042

D&L Trail Development (North Catasaqua Borough)
New Construction
Construction
$1,449,105 est. value
North Catasauqua, PA

2022 36 Minsi Trail Siphon South Access Improvements
Infrastructure
Construction
$77,400 CJ est. value
Bethlehem, PA 18018

Slate Belt Solar Farm / Lower Mount Bethel Township
Infrastructure
Pending Verification
$8,000,000 CJ est. value
Lower Mt Bethel Township, PA 18013

Lehigh Valley Trade Center III
New Construction, Infrastructure - 540,000,000 SF
Pending Verification
$45,000,000 CJ est. value
Bethlehem, PA 18020

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

Last Updated 03/07/2023 01:08 PM
Project Title

Clermont Street Reconstruction

Physical Address View project details and contacts
City, State (County) Bethlehem, PA 18017   (Northampton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

he work generally consists of furnishing all equipment, labor and materials for, but not necessarily limited to the following: removal/replacement of existing storm inlets and stormwater cross pipe, bituminous leveling course and bituminous overlay A certified check or bank draft payable to the order of Marion Heights Borough, or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to ten percent (10%) of the total of the Bid, shall be submitted with each bid. The Bidder shall include the fully completed Non-Collusion Affidavit with the bid. In addition to the Equal Employment requirements of Executive Order 11246 regarding discrimination, the CONTRACTOR must establish a 6.9% goal for female participation and a 1% goal for minority participation in his/her aggregate on-site construction workforce for contracts in excess of $10,000. The Marion Heights Borough is utilizing federal funds for this project, and Northumberland County has adopted a Minority and Women Business Enterprise (MBE/WBE) plan in accordance with Executive Orders 11625, 12138, and 12432 and a Section 3 Action Plan in accordance with Title 24 Part 75 Code of Federal Regulations. As such, the bidders/offerors must submit documentary evidence of minority and women business enterprises and Section 3 business concerns who have been contacted and to whom commitments have been made. Documentation of such solicitations and commitments shall be submitted with the bid. Moreover, the CONTRACTOR shall strive to meet the MBE goal of 5% and the WBE goal of 3% for contracts of $25,000 or more. For projects which the amount of HUD or CDBG funding exceeds $200,000 the CONTRACTOR must attempt to meet the minimum numerical goals of which 25% or more of the total number of labor hours worked by all workers on a Section 3 project are Section 3 workers, per 24 CFR Part 75.19; and 5% or more of the total number of labor hours worked by all workers on a Section 3 project are Targeted Section 3 workers, as defined in 24 CFR Part 75.21. Northumberland County, in accordance with its Section 3 Action Plan, may provide a bid preference to a bidder who is a Section 3 business concern. MBE/WBE and Section 3 business concerns shall be afforded full opportunity to bid without discrimination. Davis-Bacon and Related Acts apply to this Project. Bids may be held by Marion Heights Borough for up to 60 days from the date of opening for the purpose of reviewing the bids and investigating the qualifications of bidders prior to awarding the contract. The Marion Heights Borough reserves the right to reject any or all bids, to waive any irregularities, or to negotiate contract amounts.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents