Corte Madera Creek Flood Management Project - Zone 9 - Marin County
Infrastructure
Conception
$9,750,000 CJ est. value
San Rafael, CA 94901

Lower Las Gallinas Creek Dredge CSA 6 Santa Venetia - Marin County
Infrastructure
Conception
$2,200,000 CJ est. value
San Rafael, CA 94901

North Bay Children’s Center facilities
Demolition, New Construction, Infrastructure - 32,339 SF
Design
$9,200,000 CJ est. value
Novato, CA 94949

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

RFP - Mountain View Road Bridge Replacement Project
Demolition, New Construction, Infrastructure
Bidding
$4,114,500 CJ est. value
San Rafael, CA 94901

RFP- 2023 Madera Gardens Storm and Sewer Rehabilitation
Infrastructure
Bidding
$3,000,000 CJ est. value
Corte Madera, CA 94925

The Neighborhood at Los Gamos
New Construction, Infrastructure - 5,500 SF
Post-Bid
$69,000,000 CJ est. value
San Rafael, CA 94903

Fire Flow Improvement Program Ridge Road Pipeline Replacement Project
Infrastructure
Post-Bid
$1,760,000 est. value
Tiburon, CA

Sunny Oaks Pipeline Replacement
Infrastructure
Results
$214,000 est. value
Corte Madera, CA

E Blithedale Pipeline Replacement
Alteration
Results
$2,200,000 est. value
Corte Madera, CA

Vivian Street Multi-Residential
New Construction, Infrastructure
Pending Verification
$26,000,000 CJ est. value
San Rafael, CA 94901

Aldersly Retirement Community Redevelopment
Demolition, New Construction, Renovation, Infrastructure
Pending Verification
$20,000,000 CJ est. value
San Rafael, CA 94901

Southern Heights Boulevard at Courtright Road Retaining Wall - 206.14 - City of San Rafael
Renovation, Infrastructure
Conception
$800,000 CJ est. value
San Rafael, CA 94901

Third Street and Lincoln Avenue Mixed-Use Development
Demolition, New Construction, Infrastructure - 10,000 SF
Design
$60,000,000 CJ est. value
San Rafael, CA 94901

2023 Meadowsweet Trunk Sewer Rehabilitation - Phase III
Infrastructure
Bidding
$200,000 CJ est. value
Corte Madera, CA 94925

Last Updated 01/17/2023 08:17 AM
Project Title

Barber Avenue Pipeline Replacement Project

Physical Address View project details and contacts
City, State (County) San Anselmo, CA 94960   (Marin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $163,800 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This contract is for furnishing labor and equipment for the installation of 440 feet of 6-inch welded steel pipe with valves, fittings and appurtenances. The work to be done is located in the Town of San Anselmo within the County of Marin, California. The Contractor performing work under this contract shall possess a class A or C-34 Contractor's license which is valid in the State of California at the time the contract is awarded. No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to labor Code section 1725.5 (with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a). No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The prevailing rate of wages in the locality in which work is to be performed has been ascertained by the District and published under the provisions of Section 1773 of the California Labor Code. For the most current prevailing wage rates the Contractor may visit the state of California Prevailing Wage Determinations website. Copies of the prevailing wage rates are also on file and available at the Office of the Manager of Engineering at 220 Nellen Avenue, Corte Madera, and in the office of the Marin County Department of Public Works, Civic Center, Room 304, San Rafael, California. It shall be mandatory upon the Contractor to whom the contract is awarded and upon any subcontractor under him to pay not less than the said prevailing wage rates to all workers employed by them in the execution of the contract. On this contract, eight hours shall constitute a legal day's work. Work beyond eight hours shall be paid at a rate not less than one and one-half times the prevailing rates. Wage rates for Sundays and holidays shall be paid at a rate not less than two times the prevailing rates. The holidays upon which such rates shall be paid shall be all holidays recognized in the collective bargaining agreement applicable to the particular craft, classification or type of workers employed on the project. Unless otherwise specified, proposals will be considered for the complete job only. In accordance with the Instructions to Bidders, all bid documents must be completed on forms supplied with the contract specifications. Each Bidder is requested to return the entire specification booklet. The Bidder must include a certified check, cash, cashier's check or bid bond executed by an admitted surety authorized by the California State Department of Insurance to transact business in California as a guarantee that the Bidder will, if successful, promptly execute a satisfactory contract and furnish bonds as required by these specifications. The certified check, cash, cashier's check or bid bond shall be not less than ten (10) percent of the total amount of the bid and shall be payable to the Marin Municipal Water District. In compliance with Section 22300 of the Public Contract Code, the Successful Bidder may, at his expense, choose to exercise one of the following options regarding retentions: (1) to deposit securities (under District control) equivalent to the retention amount normally withheld by the District; or (2) to execute an escrow agreement and have the District make retention payments directly to an escrow agent; or (3) to execute a retention agreement indicating that normal retention will be deposited in a joint account under District control. If an escrow agreement for security deposits is used in lieu of retention, it shall be in a form substantially similar to that specified in Public Contracts Code Section 22300. If any of the above options are chosen, the District will withhold no retention on progress payments. District control of securities or accounts will be released in the same manner as release of normal retention funds as indicated in the general specifications. Securities eligible for investment shall include those listed in Section 16430 of the Government Code or bank or savings and loan certificates of deposit. The Bidder's attention is drawn to the General Specifications section regarding Dispute Resolution. This section provides any disputes or claims between the District and the Contractor are subject to mediation, and then if still unresolved, at the sole election of the District, to binding arbitration. The Bidder's attention is also called to Marin Municipal Water District Code Sections 2.90.065 through 2.90.067 which permit the District to disqualify a Contractor from bidding on future contracts with the District if the contractor fails to comply with the rules and regulations specified in the District's code or the requirements for performance specified in this contract including submission of false claims to the District. BEFORE BIDDING: Bidders should contact their insurance brokers to verify that their insurance meets all insurance requirements of the contract and that their broker will provide a completed MMWD Additional Insured Endorsement. Bidders should provide pages XIV, XIV-a and XIV-b of the contract to their insurance brokers for reference. Proposals must be submitted in a sealed envelope addressed to the attention of the Director of Engineering, with the words "Barber Avenue Pipeline Replacement Project - Contract No. 1983, JUNE 21, 2022," clearly marked on the outside of the envelope. Bidders who have questions should contact Zak Talbott at 415-945-1508. The District reserves the right to reject any and all bids and to waive any irregularities in said bids.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents