Similar Projects
Replace Building 48 Roof System
Term Contract
Design
$500,000 to $1,000,000 est. value
Hines, IL 60141

Replace/Repair Roofing Systems
Alteration
Design
$219,200 est. value

CPS Bowen HS Roof Patching
Alteration
Bidding
$300,000 est. value
Chicago, IL 60617

Roof Repair Replacement Authority-Wide (As Needed)
Alteration
Bidding
Chicago, IL

2021 Roof Replacement at Arbor Park MS
Post-Bid
Oak Park, Tinley Park, IL 60477

Roofing Repair and Maintenance
Post-Bid

2021 Roof Repairs At Multiple Sites
Results
Hoffman Estates, IL 60169

Roof Replacement at Chippewa School
Results
Palos Heights, IL 60463

Heatherfield Roof Replacements
Renovation, Alteration
Design
Glenview, IL 60025

Bone Marrow Fan Replacement - Divisions 03, 04, 05
Alteration
Bidding
$100,000 est. value
Chicago, IL 60612

2021 Roof Repairs at Heritage Middle School
Post-Bid
Berwyn, IL 60402

Water Plant Roof Replacement- Reaction Basin and Chlorine Room
Results
Winnetka, IL

Gymnasium and Cafeteria Re-Roofing
Alteration
Bidding
$700,000 est. value
Chicago Heights, IL 60411

2021 South Building Roof Replacement
Post-Bid
Flossmoor, IL 60422

Roof Improvements
Results
Chicago Ridge, IL 60415

Last Updated 05/18/2022 03:36 PM
Project Title

North Shore Center for the Performing Arts Roof Rehabilitation

Physical Address View project details and contacts
City, State (County) Skokie, IL   (Cook County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. Provide Unit Price per Sq.Ft. for the repair of concrete deck on a per square foot basis. B. Provide a unit price for providing and installing new treated wood blocking as required to replace existing components. Unit Pricing to be based on a 2x4, 2x6, 2x8 per 8 linear feet basis. C. Provide a Unit Price for the removal and replacement of existing drain head assemblies inclusive of all required modifications/replacement of drain piping as well as all required accessories and components. Unit Pricing to be based on a per drain head (unit) basis. D. In the event that additional work items must be referenced to actual expended time, submit labor rate charges for such work. E. Identify the cost "mark-up" for additional materials incorporated into the work. F. Identify the cost of providing a Performance Bond based upon the total cost of the Bid

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents