Similar Projects
Little Scholars Academy
Renovation - 2,895 SF
Design
Huntersville, NC 28078

CMAQ Sidewalk Improvements
Post-Bid
Claremont, NC

Rockingham Community College Parking Lot Restriping and Patching
Post-Bid
Wentworth, NC 27375

Driveway Repairs for Durham County Fire Stations
Results
Durham, NC

Sunset Streetscape Improvements
Results
Blowing Rock, NC

North Main Street and Lexington Avenue Intersection and Utility Improvements
Post-Bid
High Point, NC

Haywood Streetscape
Results
Less than $4,749,345 est. value
Asheville, NC

West Water Street Parking Lot Expansion
Post-Bid
Lincolnton, NC

Wilson Street Sidewalk
Results
Wingate, NC

Parking Lot Asphalt Replacement
Post-Bid
Raleigh, NC 27607

North Academic Drive Renovation Project
Results
Less than $1,808,000 est. value
NC

Poston Park ADA Trail
Post-Bid
Lowell, NC

Little Sugar Creek Greenway and Stream Enhancement Project, I-485 to Polk Street
Results
Pineville, NC 28134

Glen Eden Tennis Access Sidewalk
Post-Bid
Raleigh, NC

Edgewood Road Parking Lot
Results
Asheville, NC 28804

Reported 08/19/2020 12:00 AM
Project Title

Fuse Streetscape - Phase I

Physical Address View project details and contacts
City, State (County) Gastonia, NC 28053   (Gaston County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes work on the west side of Hill St, the east side of Trenton and the intersections of Trenton & Main, Hill & Main, and Trenton & Airline. Work has been value Engineered out as follows: 1. The curb / gutter and sidewalk on the west side of Hill, from Franklin to Main will not be removed and replaced with this contract. The corner of Hill and Main and the drive at Sav A Lot will still need to be constructed. The work on the west side of Hill, north of Main, is still included. 2. Franklin Blvd will not be milled or resurfaced. 3. The work in Franklin Blvd including median, delineators, striping will be done under separate contract. 4. The work on the south side of Franklin will not be done with this contract. 5. Staging can occur on City owned property behind Coca Cola Building. 6. The request to close Trenton from Franklin to Main is being entertained by City, and has a high probability of approval.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents