Similar Projects
San Souci Road Elevation Design
Infrastructure
Design
WA

2022 Utilities Project
Infrastructure
Bidding
$1,932,000 est. value
Buckley, WA 98321

8th Street and Selkirk Avenue Improvements
Infrastructure
Bidding
$370,000 est. value
Mattawa, WA 99349

Fakkema Access Road
Infrastructure
Post-Bid
$650,000 to $850,000 est. value
Oak Harbor, WA 98277

Logging Road Resurfacing
Infrastructure
Post-Bid
Montesano, WA

Construction of the 34th Avenue S, South 166th Street to South 160th Street
Infrastructure
Results
$6,250,000 to $7,250,000 est. value
Sea-Tac, SeaTac, WA 98188

San Juan County Prune Alley Street Improvements
Infrastructure
Results
$3,500,000 to $3,900,000 est. value
Eastsound, WA 98245

East Wynooche Avenue Improvements
Infrastructure
Bidding
$900,000 est. value
Montesano, WA 98563

Dodson Road Overlay
Infrastructure
Post-Bid
Ephrata, WA

Exposed Sewer Pipe Repairs - Site 5
Infrastructure
Results
$3,200,000 to $3,700,000 est. value
Bothell, WA 98011

2022 Port Wide Paving
Infrastructure
Bidding
$200,000 est. value
Longview, WA

Metzger Road Project CRP
Infrastructure
Post-Bid
Carson, WA 98610

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Results
$1,289,979 est. value
Eatonville, WA 98328

2022 Paving Unpaved Streets - North
Infrastructure
Bidding
$250,000 to $500,000 est. value
Spokane, WA

2022 Preservation Project - Glenwood Rd & Holly Road
Infrastructure
Post-Bid
$900,000 to $1,250,000 est. value
WA

Last Updated 06/17/2022 07:27 AM
Project Title

Hamilton Street Improvements

Physical Address View project details and contacts
City, State (County) East Wenatchee, WA 98802   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $700,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The major items of roadway work along Stnaderfer Street from Valley Mall Parkway to French Avenue as well as Hamilton Street from Standerfer Street to 9th Street NE shall include, but not limited to roadway reconstruction, sidewalk, curbing, paving, striping, ADA ramp improvements, illumination, stormwater system improvements, grading, watermain, and related work in accordance with the contract plans, special provisions, and the WSDOT/APWA Standard Specifications.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Storm Drainage Structures, Storm Drainage Water Detention Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents