Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

Septic System Replacement
Alteration
Design
WA

Bangor Keyport Force Main Replacement
Renovation, Infrastructure
Bidding
$23,200,000 to $24,700,000 est. value
Poulsbo, WA 98370

Shore Avenue Force Main
Infrastructure
Bidding
Everett, WA 98203

Value Planning Analysis Services - The City of Palouse
Term Contract, Alteration
Post-Bid
Palouse, WA

Allen Road Sanitary Sewer Improvements
Infrastructure
Post-Bid
$225,000 est. value
Roy, WA 98580

Southside Interceptor CIPP Sewer Rehabilitation Phase 2
Infrastructure
Results
$1,662,108 est. value
Vancouver, WA 98687

Exposed Sewer Pipe Repairs - Site 5
Infrastructure
Results
$3,200,000 to $3,700,000 est. value
Bothell, WA 98011

Crusher Canyon Road Sanitary Sewer Improvements
Infrastructure
Bidding
Selah, WA 98942

Highlands and Northwest Interceptor Sewer Rehabilitation
Infrastructure
Post-Bid
$1,206,033 est. value
Kennewick, WA 99336

Mcmillin Reservoir Onsite Septic System Holding Tank Construction for Comfort Station
Infrastructure
Results
WA 98374

Septic Pumping at Okanogan County Fairgrounds
Infrastructure
Bidding
Okanogan, WA 98840

Continuous Steel Sewer Rod - Value Blanket
Infrastructure, Alteration
Post-Bid
Spokane, WA

Mercer Island and Enatai Interceptor Upgrade-Conveyance Improvements
Infrastructure
Results
$52,417,000 est. value
WA

2022 Valve and Manhole Adjustment Project
Infrastructure
Bidding
$325,000 est. value
Bothell, WA

Last Updated 04/12/2022 11:31 AM
Project Title

Sewer Main Relining - Fircrest Drive

Physical Address View project details and contacts
City, State (County) Port Orchard, WA   (Kitsap County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value Less than $350,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of traffic control, cleaning, televising and installing 1,043 ft. of 15 inch CIPP liners in 4 separate sections. Hydrophilic end seals, removing 3 protruding laterals, cut out of bad liner, reinstating 4 service laterals, sewer by pass pumping, full rehabilitation of 5 manholes and installation of flow through liners in 2 other manholes that will also require bypass pumping.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 34 - Transportation, Roadway Signaling and Control Equipment, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents