Similar Projects
Reported | 06/23/2022 12:00 AM |
Project Title | Beelzebub Road Reconstruction |
Physical Address | View project details and contacts |
City, State (County) | South Windsor, CT 06074 (Hartford County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | In general the work to be performed under this contract is for the full depth reconstruction of approximately 4910 feet of Beelzebub Road. This includes installation of new drainage pipe, catch basins, manholes and hydrodynamic separators, replacing or resetting sanitary manhole frames and covers, excavation and removal of the existing pavement and base material down to the subgrade as shown on the plans, installation of new processed aggregate base material, 2 lifts of new HMA pavement, bituminous curb, pavement markings and signs, repaving driveway aprons, cutting, filling and grading road side slopes, installing topsoil and grass seed on all disturbed roadside areas and installing concrete sidewalks and ramps |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |