Similar Projects
Knox Woods and Riverside No. 1 Wastewater Pump Station Upgrades
Bidding
Ballston Spa, NY 12020

Gorge Pump Station Rehabilitation Niagara Falls Water Board
Bidding
Niagara Falls, NY 14304

Ballston Lake Sewer Project
Post-Bid
Less than $10,000,000 est. value
Ballston, NY 12027

North Ferry Street Sewage Pump Station Flood Mitigation Improvements
Term Contract
Post-Bid
Less than $13,000,000 est. value
Schenectady, NY 12305

Provide Domestic Water Pump Station
Results
$6,075,000 to $8,150,000 est. value
Albany, NY

Raw Water Pumping and Transmission Improvements
Results
Less than $775,000 est. value
Ithaca, NY 14850

Well Field Control Building
Construction
$4,400,000 est. value
Ticonderoga, NY 12883

Contract G - Foxwod Road, Rinne Road and Western Highway Pump Station Replacements
Construction
New City, NY

Cumberland Avenue Pump Station CSO Upgrades
Post-Bid
Plattsburgh, NY 12901

Chemung County Sewer District Pump Station Improvements
Results
Elmira, NY

Gore Mt. Snowmaking Improvements - Reservoir Pumphouse and Expansion
Construction
North Creek, NY 12853

Wastewater Pump Station Improvements
Post-Bid
Poughkeepsie, NY 12602

Lexington Hill Pump Station Upgrade
Results
Harriman, NY 10926

Upper Washington Avenue Pressure Zone Water Pump Station
Construction
Albany, NY 12207

WPCP Low Lift Pump Improvements
Post-Bid
Poughkeepsie, NY 12601

Last Updated 12/11/2018 08:30 AM
Project Title

FY18 Sewage Lift Station Replacement

Physical Address View project details and contacts
City, State (County) Buffalo, NY 14207   (Erie County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The U.S. Army Corps of Engineers is issuing a combined synopsis/solicitation for Services that includes but not limited to: - Demolition of existing Lift Tank and New Floor. - Install New Pump system and Tank. The selected contractor must comply with all security requirements when accessing the Federal facility.
Details
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents