Similar Projects
Last Updated | 06/25/2021 01:39 PM |
Project Title | CTH K Project 2 |
Physical Address | View project details and contacts |
City, State (County) | WI (Vilas County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Pulverization of the existing roadway, shaping, final grading and compacting of existing roadway to a width of 28’, placement of 3” X 22’ of compacted hot mix asphalt surface. All inside radiuses shall have a 2’ paved shoulder. All ATV trail crossings shall have a 6’ paved apron and all private gravel driveways shall have a 1’ paved apron. 3’ paved shoulder at East Buckatabon Creek both sides of road for approximately 600’. This project begins at West Buckatabon Road and proceeds east for 2.1 miles to East Buckatabon Road. This section is approximately 11,100’ in length. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |