Similar Projects
Last Updated | 12/01/2022 06:01 PM |
Project Title | 10190 Iron Rock Way Tenant Improvements |
Physical Address | View project details and contacts |
City, State (County) | Elk Grove, CA 95624 (Sacramento County) |
Category(s) | Government/Public |
Sub-Category(s) | Misc. Buildings |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,208,315 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The proposed Work shall be performed in accordance with the plans, specifications and other Contract Documents and shall include but not be limited to the following: selective demolition, Architectural, plumbing, mechanical, electrical, low voltage, lighting, modifications to the Fire Sprinkler and Alarm systems, modifications to the camera surveillance and access control management systems (ACMS), new site CMU block wall and masonry (Bid Alternate 12), and Furniture, Fixture and Equipment (FF&E) procurement and installation. The Work will result in the demolition of existing unoccupied spaces to expand the Women's locker room, relocate, refurbish and install sixteen (16) existing lockers to include pedestals, electrical and lighting, procure and install up to thirty (30) new lockers to include electrical and lighting (Bid Alternates 9-11), infill existing external storage space for new Armory, SWAT and Work Bench spaces, new Heating, Ventilation and Air Conditioning (HVAC) system to include one new air conditioning (AC) unit, five (5) new pneumatic lines connected to a City furnished air compressor at these new spaces (new Armory, SWAT and Work Bench spaces), FF&E consisting of storage solutions, new lighting, cameras, access control, flooring, casework and wall finishes. The Contractor shall provide temporary facilities to support the onsite operation to include a three (3) stall self-contained restroom and shower facilities to include full service and janitorial services during construction (Work). Bid Bond Percentage: 10% Engineers Estimated Cost: $1,284,000 to $1,284,000 Pre-Qualification for Bidders: Not Required License Type Required: B, C-16 Project/Contract Number: WFC045 |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |