Similar Projects
Last Updated | 05/01/2023 11:04 AM |
Project Title | FY2023 Pickles Butte Sanitary Landfill Dust Control System |
Physical Address | View project details and contacts |
City, State (County) | Caldwell, ID 83607 (Canyon County) |
Category(s) | Heavy and Highway, Single Trades |
Sub-Category(s) | Landscaping, Landscaping/Irrigation |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected October 2023 |
Bids Due | View project details and contacts |
Estimated Value | $800,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Any questions about the project should be directed in writing to: David Loper, Director Canyon County Solid Waste 15500 Missouri Avenue Nampa, Idaho 83686 Or via electronic mail to: David.Loper@canyoncounty.id.gov. Telephone questions will not be accepted. Questions about, or objections to, the specifications or bid procedures must be received in writing or email by Thursday, February 23, 2022, at 9:30 a.m. Questions about the bid process must be directed to David Loper, Landfill Director, at (208) 614-5005 or David.Loper@canyoncounty.id.gov. Although the County intends to accept the responsive bid proposing the lowest, it reserves the right to reject any or all bids or to otherwise act in the best interest of the County. Payment for services at the approved completion of the work will be made in accordance with the contract. Canyon County and its Department of Solid Waste hereby solicits bids from qualified contractors for construction of facilities related to a Dust Control System. The project will be referred to as FY2022 Pickles Butte Sanitary Landfill Dust Control System Project. The project includes the following elements: 1 Additional information about the requirements and more particularly described in the County's detailed specifications and drawings are provided in Attachment 1 attached hereto. Engineering and construction oversight for the project will be provided by Tetra Tech. 2. Mobilization and demobilization 3.Provide and install a pre-cast pump house 4.Provide and install a buried, pre-cast, 15,000-gaHon water tank 5.Provide and install a buried HDPE pipe from an existing well to the buried tank 6.Provide and install a pre-manufactured, J-stand for loading water into water trucks 7.Provide and install interior piping and appurtenances Design, provide and install all electrical and control equipment to operate the system. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |