Similar Projects
Scheduled and Emergency Bridge Deck Repairs and Related Work at Various Locations
Bidding
Less than $923,540 est. value

Scheduled and Emergency Bridge Deck Repairs and Related Work at Various Locations
Bidding
Less than $923,540 est. value

Scheduled and Emergency Drawbridge Operation, Maintenance and Repairs at Various Locations
Post-Bid
Less than $5,090,000 est. value

Chestnut Hill Loop Bridge Over Chestnut Hill Brook
Post-Bid
Less than $400,000 est. value
Montague, MA 01351

Scheduled and Emergency Bridge Steel Beam Repairs (including Painting) at Various Locations Excluding the Islands
Results
Less than $1,539,000 est. value

Replacement of Fisher Street Bridge over Assabet River
Results
$1,100,000 est. value
Westborough, MA 01581

East Road over West Brook Bridge Replacement Project
Bidding
$1,140,000 est. value
Orange, MA 01364

Bridge Replacement BR. No. P-10-042 (Next Beams) New Road over the West Branch of the Housatonic River
Results
Less than $2,261,000 est. value
Pittsfield, MA 01201

Bridge Rehabilitation Project
Bidding
$574,000 est. value
Granville, MA 01034

Construction of the Columbia Greenway Rail Trail and Related Work Including 5 Railroad Bridges
Results
Less than $6,422,000 est. value
Westfield, MA 01085

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Bidding

Scheduled and Emergency Bridge Deck Repairs at Various Locations on Interstate 90
Results
Less than $2,351,000 est. value

Scheduled and Emergency Structural Repairs at Various Locations
New Construction
Bidding
$1,459,640 est. value

Bridge Structure Repairs (Including Painting) at Various Locations
Results
Less than $960,000 est. value

Replacement of Bridge at Interlaken Road Over Larrywaug Brook
Bidding
$1,440,000 est. value
Stockbridge, MA

Last Updated 11/20/2019 10:47 AM
Project Title

Scheduled and Emergency Bridge Deck and Joint Repairs at Various Locations

Physical Address View project details and contacts
City, State (County) (Berkshire, Franklin, Hampden, Hampshire, Worcester Counties)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,489,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

"500.000","Hr","Base Labor Rate","100.1" "100.000","Sy","Clearing And Grubbing","101.01" "10.000","Ft","Bridge Curb Removed And Reset","106.12" "200.000","Hr","Bridge Washing","106.45" "100.000","Ft","Elastomeric Headers","106.491" "20000.000","Lb","Low Alloy Steel Plates","107.02" "160.000","Ft","Precompressed Impregnated Foam Joint Sealer","107.471" "400.000","Ft","Sealing Random Cracks In Cement Concrete Pavement","107.85" "50.000","Cy","Unclassified Excavation","120.1" "42.000","Cy","Reinforced Concrete Excavation","127.1" "40.000","Sy","Reinforced Concrete Deck Excavation (Full Depth)","127.4" "25.000","Cy","Reinforced Concrete Deck Excavation (Partial Depth)","127.41" "300.000","Sy","Old Pavement Excavation","129.2" "100.000","Ft","Old Asphaltic Plug Joint Removed And Discarded","129.61" "80.000","Sy","Pavement Milling (Quality Assurance)","130." "50.000","Cy","Gravel Borrow - Type c","151.01" "20.000","Ft","Polyvinyl Chloride Drain Pipe","251." "10.000","Ton","Superpave Surface Course – 9.5 (Ssc – 9.5)","450.22" "10.000","Ton","Superpave Intermediate Course - 12.5 (Sic -12.5)","450.31" "20.000","Ton","Superpave Base Course - 37.5 (Sbc - 37.5)","450.42" "70.000","Ton","Superpave Bridge Surface Course - 9.5 (Ssc-b - 9.5)","450.60" "110.000","Ton","Superpave Bridge Protective Course – 12.5 (Spc-b - 12.5)","450.71" "20.000","Gal","Asphalt Emulsion For Tack Coat","452." "100.000","Ft","Hma Joint Sealant","453." "50.000","Ton","Asphalt Mixtures For Temporary Work","472." "200.000","Ft","Milled Rumble Strip","477." "50.000","Sy","Asphaltic Bridge Joint System Surface Treatment","481.415" "200.000","Gal","Hot Applied Rubberized Asphaltic Crack Filler","482.17" "150.000","Ft","Sawing & Sealing Joints In Asphalt Pavement At Bridges","482.31" "24.000","Mo","Engineers Field Office And Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "4.000","Ea","Emergency Response","748.1" "50.000","Hr","Roadway Flagger","850.41" "30.000","Day","Traffic Cones For Traffic Management","851.1" "150.000","Sf","Safety Signing For Traffic Management","852." "1500.000","Ft","Temporary Barrier Removed And Reset","853.21" "1500.000","Ft","Temporary Barrier - Limited Deflection (Tl-3)","853.33" "20.000","Day","Truck Mounted Attenuator","853.403" "8.000","Ea","Temporary Impact Attenuator Removed And Reset","853.501" "8.000","Ea","Temporary Impact Attenuator Unidirectional, Non-Redirective (Tl-3)","853.53" "4.000","Ea","Temporary Impact Attenuator Bi-Directional, Non-Redirective (Tl-3)","853.73" "6000.000","Ft","Temporary Paving Markings - 6 Inch (Painted)","854.016" "3000.000","Sf","Pavement Marking Removal","854.1" "60.000","Day","Portable Changeable Message Sign","856.12" "10000.000","Day","Reflectorized Drum","859." "1000.000","Day","Reflectorized Drums With Sequential Flashing Warning Lights","859.1" "6000.000","Ft","6 Inch Reflectorized White Line (Painted)","860.106" "6000.000","Ft","6 Inch Reflectorized Yellow Line (Painted)","861.106" "20.000","Ea","Slotted Pavement Marker Two-Way Yellow/Yellow","864.35" "1000.000","Ft","6 Inch Reflectorized White Line (Polyurea) (Recessed)","866.206" "1000.000","Ft","6 Inch Reflectorized Yellow Line (Polyurea) (Recessed)","867.206" "85.000","Cy","4000 Psi, 3/8 Inch, 660 Cement Concrete","905." "25.000","Cy","Rapid Setting Concrete","909.5" "7000.000","Lb","Steel Reinforcement For Structures - Epoxy Coated","910.1" "2000.000","Sf","Steel Encapsulant Coating For Beam Ends","962.1" "1000.000","Sy","Concrete Penetrant/Sealer","964.01" "100.000","Sy","Membrane Waterproofing For Bridge Decks","965." "2700.000","Sf","Membrane Waterproofing For Bridge Decks - Spray Applied","965.2" "100.000","Sf","Repair Of Membrane Waterproofing For Bridge Decks - Spray Applied","965.21" "100.000","Ft","Asphaltic Bridge Joint System","971." "50.000","Ft","Rapid Cure Extruded Silicone Rubber Joint Seal","972.2" "3105.000","Sf","Temporary Protective Shielding","994.1"

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents