Similar Projects
Babbitt Ranch Solar and Storage
New Construction, Infrastructure
Conception
$98,000,000 CJ est. value
Williams, AZ 86046

Babbitt Ranch Wind
New Construction, Infrastructure
Conception
$39,500,000 CJ est. value
Williams, AZ 86046

Northern Arizona Healthcare Flagstaff Medical Center Expansion
Addition, Demolition, Infrastructure
Design
$6,000,000 CJ est. value
Flagstaff, AZ 86001

AutoZone #2782 / Flagstaff
New Construction, Infrastructure - 8,000 SF
Design
$1,500,000 CJ est. value
Flagstaff, AZ 86004

RFQ Construction Managet at Risk - Spruce Wash Improvements Project
Infrastructure
Bidding
$25,800,000 CJ est. value
Flagstaff, AZ 86001

City of Page Drainage Improvements FY23
Infrastructure
Bidding
$2,000,000 CJ est. value
Page, AZ 86040

GRCA 190083 - Improve Potable Water Supply to Innercanyon and South Rim, Transcanyon Water Distribution Pipeline, Grand Canyon National Park
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Grand Canyon, AZ 86023

For the Construction of Segmented Circle Relocation Project
Infrastructure
Post-Bid
$200,000 CJ est. value
Page, AZ 86040

Substance Abuse and Residential Facility
New Construction, Infrastructure - 6,000 SF
Results
$3,262,000 CJ est. value
Page, AZ 86040

Public Works Facility Fy22
New Construction, Infrastructure - 12,576 SF
Results
$4,696,000 CJ est. value
Page, AZ 86040

Clear Sky Resorts - Grand Canyon
New Construction - 33,000 SF
Construction
Williams, AZ 86046

Kachina Trail Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Flagstaff, AZ 86001

Quintana Drive Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Gray Mountain, AZ 86020

Holiday Inn / Flagstaff
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Flagstaff, AZ 86004

Babbitt Ranch Solar and Storage
New Construction, Infrastructure
Design
$98,000,000 CJ est. value
Williams, AZ 86046

Last Updated 01/06/2023 01:37 PM
Project Title

Shadow Mountain Drive Hotel Remodel

Physical Address View project details and contacts
City, State (County) Bellemont, AZ 86015   (Coconino County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A more exact scope of work for the remodel has not been announced including the square footage. This project is scheduled to go before Coconino County Planning on January 25, 2023. Information regarding an architect or general contractor has not been disclosed. Although there is not a firm timeline has not been announced, construction could begin in third quarter 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents