Similar Projects
Worden Park-East Playground - City of Royal Oak
Renovation, Infrastructure
Conception
$300,000 est. value
Royal Oak, MI 48073

Currie Parkway Bridge: Rehabilitation - City of Midland
Renovation, Alteration
Conception
Less than $460,000 est. value
Midland, MI 48640

Maple Lane Resurfacing - 14 Mile Road to Volpe - City of Sterling Heights
Infrastructure, Alteration
Conception
$1,800,000 est. value
Sterling Heights, MI 48312

College Avenue - Leonard Street to Sweet Street - City of Grand Rapids
Infrastructure, Alteration
Conception
$542,180 est. value
Grand Rapids, MI 49505

Construct New Addition to Transit Administrative Building - City of Battle Creek
Addition, Infrastructure
Conception
$16,400,000 CJ est. value
Battle Creek, MI 49014

Soccer Complex to Coolidge Road - City of East Lansing
Infrastructure
Conception
$600,000 est. value
East Lansing, MI

Parking Lot Resurfacing and Entry Drives / East Lansing Soccer Complex
Infrastructure
Conception
$325,000 CJ est. value
East Lansing, MI 48823

South End Development (1901 S. Trumbull St.) - Bay City
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Bay City, MI 48708

Union Street Dam Improvements - 168-19-CIP - City of Traverse City
Renovation, Infrastructure
Conception
$19,600,000 CJ est. value
Traverse City, MI 49684

Woodland Park & Nature Preserve - Planning/Improvement - City of Battle Creek
New Construction, Infrastructure, Term Contract
Conception
$1,980,000 CJ est. value
Battle Creek, MI 49017

Eighth Street- Lake Avenue to Woodmere - 882-18-CIP - City Of Traverse City
Infrastructure
Conception
$10,550,000 CJ est. value
Traverse City, MI 49684

Orchard Lake Road Mixed-Use / Keego Harbor
New Construction, Infrastructure - 15,000 SF
Conception
$95,000,000 CJ est. value
Keego Harbor, MI 48320

Linear Park Expansion, North Side to South Side - City of Battle Creek
Infrastructure
Conception
$2,500,000 CJ est. value
Battle Creek, MI 49015

Linear Path Expansion along 28th Street - City of Battle Creek
Infrastructure
Conception
$520,000 CJ est. value
Battle Creek, MI 49015

Metcalf Lake Development - City of Battle Creek
Infrastructure, Renovation
Conception
$400,000 CJ est. value
Battle Creek, MI 49014

Last Updated 01/30/2023 09:07 AM
Project Title

Branch Solar Farm and Substation

Physical Address View project details and contacts
City, State (County) Bethel Township, MI 49036   (Branch County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Power Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $267,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 2023, the owner is awaiting final special use permit approvals from Bethel Township. General Contractor information is unknown. Construction start is expected first quarter 2024.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Acre, 1546 Acre.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents