Similar Projects
Milwaukee Federal Building and US Courthouse Fire Life Safety Construction Manager as Constructor (CMc)
Design
$5,000,000 to $10,000,000 est. value
Milwaukee, WI 53202

Install Fire Suppression System -GPC
Alteration
Bidding
$2,440,000 est. value
Madison, WI 53704

Engineering Hall Sprinkler and Gas Piping-Phase 1 - GPC
Infrastructure, Alteration
Bidding
$3,500,000 est. value
Madison, WI 53706

Testing, Repairing and Recharging Fire Extinguishers and Fire Suppression Systems at Various MPA Schools
Term Contract
Post-Bid
Milwaukee, WI 53208

Milwaukee Fire Life Safety CMc
Post-Bid
$8,000,000 to $10,000,000 est. value
Milwaukee, WI 53202

Training Kitchen Fire Suppression and Exhaust Replacement
Results
Less than $232,000 est. value
Oshkosh, WI 54901

Fire Alarm Panel Replacement
Results
Less than $72,000 est. value
Madison, WI 53703

Propane Backup Replacement
Infrastructure
Bidding
$127,000 est. value
Oneida, WI 54155

Maintenance- Fire Protection Systems
Term Contract
Post-Bid
Milwaukee, WI

Capitol Drive Airport Fuel System Upgrade
Results
Pewaukee, WI 53072

Testing of Fire Alarm System
Term Contract, Alteration
Bidding
Madison, WI 53705

Westnor Apartments Fire Alarm Replacement
Post-Bid
Fond du Lac, WI 54935

2020 Chemical Phosphorus Improvements
Results
Waterloo, WI 53594

Kenosha County Brookside Care Center Fire Protection Piping Replacement
Alteration
Post-Bid
Kenosha, WI 53144

Fueling Facility Upgrades
Results
McFarland, WI 53558

Last Updated 11/10/2021 01:27 PM
Project Title

Engineering Hall Sprinkler and Gas Piping-Phase 1 - MEP

Physical Address View project details and contacts
City, State (County) Madison, WI 53706   (Dane County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Fire Protection, Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work consists of providing a new fire protection system for the eastern third of the Engineering Hall facility. This new system will include a new fire pump and a new dedicated fire pump room on the basement level. New standpipe distribution for the fire protection system will be installed throughout the entire building in preparation of future work the remaining two-thirds of the facility. The new fire pump will require an updated electrical service. The existing hazardous storage room located on the basement floor will be renovated to include updated spaces for H-2 Gas Storage and H-2 Flammable Liquid Storage. In addition, Hydrogen laboratory gas currently located throughout the building will be consolidated and centralized within the new H-2 Gas Storage Room. From this location Hydrogen gas will be piped to various laboratory locations in the eastern third of the building at low and high pressures. The existing facility features a mixture of ceiling types (i.e. drop-in, hard ceiling, exposed, etc.) which will need to be temporarily removed and re installed for the installation of new piping elements

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 21 - Fire Suppression.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents