Similar Projects
Tempe Campus Central Utility Plant
New Construction
Conception
Tempe, AZ 85281

Construction Manager at Risk (CMAR) Northeast Infrastructure Improvements Project
Infrastructure
Bidding
$50,000,000 est. value
Queen Creek, AZ 85140

US-93 Sewer Relocation Project
Infrastructure
Bidding
Wickenburg, AZ

Water/Wastewater Pumps (Sales, Service and Repairs)
Term Contract
Post-Bid
Mesa, AZ 85210

Grease Trap Cleaning Services
Post-Bid
Peoria, AZ

Professional Services for Loop 101 and Loop 202 Freeway Waterline and Sewer Rehabilitation
Results
Chandler, AZ 85225

Sanitary Sewer Repair and Replacement
Results
$111,357 est. value
Guadalupe, AZ 85283

Van Buren Relief Sewer Project - 48th Street to Loop 202 Design-Bid-Build
Infrastructure
Bidding
Phoenix, AZ 85042

Wastewater Collection System Rehabilitation
Post-Bid
Guadalupe, AZ

Luke Air Force Base Lift Station Construction Manager at Risk Services
Results
$3,000,000 est. value
Glendale, AZ 85301

Construction of Sun City Festival Ranch Infrastructure Sewer for Parcel E2
Post-Bid
Buckeye, AZ

Loop 101 & 202 Freeway Waterline and Sewer Rehabilitation
Results
Chandler, AZ 85225

Recoat Discharge Tubes at Mark Wilmer Pumping Plant
Renovation
Post-Bid
Phoenix, AZ

Jomax Booster Station Upgrades & Terramar Booster Pump Station Rehabilitation - CMAR
Results
Peoria, AZ 85345

Storm Water Pump Lift
Term Contract
Post-Bid
Phoenix, AZ 85012

Reported 03/30/2022 12:00 AM
Project Title

Construction Manager at Risk Services for Sewer Lift Station Rehabilitation

Physical Address View project details and contacts
City, State (County) Chandler, AZ   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $2,000,000 to $5,000,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City’s collection system consists of sewer lift station, large diversion/junction structures, and over 880 miles of sanitary sewer pipelines that collect and convey wastewater to water reclamation facilities. A recently completed assessment identified specific repairs and rehabilitation action to several existing sewer lift stations and a large diversion/junction structure. The repair and rehabilitation work includes replacement of deteriorated access hatch covers, piping, rehabilitation of concrete coating systems, valve replacements, installation of fall protection grating and electrical improvements.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents