Similar Projects
Planet Kids
New Construction - 9,267 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
West Palm Beach, FL 33407

Our Lady of the Rosary School Expansion
New Construction - 20,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Miami, FL 33176

Le Parc at Lauderhill
New Construction - 3,500 SF
Design
$500,000 to $1,000,000 CJ est. value
Lauderhill, FL 33313

Fountains at St. Johns - Master Plan
New Construction - 110,000 SF
Design
$10,000,000 CJ est. value
Saint Johns, FL

Amazing Explorers Academy - Silverleaf
New Construction - 5,200 SF
Bidding
$1,000,000 to $5,000,000 CJ est. value
Saint Augustine, FL

Addition/Alteration and Repair Child Development Center, Bldg 90353
Addition - 1,789 SF
Post-Bid
$1,000,000 to $5,000,000 est. value
Hurlburt Field, FL 32544

The Learning Experience
New Construction - 16,323 SF
Post-Bid
$1,425,000 est. value
Palm Beach Gardens, FL 33403

Tiny Tots Academy
Addition - 1,787 SF
Construction
$45,000 est. value
Hollywood, FL 33023

Rainbow Child Care Center
New Construction - 11,992 SF
Construction
Lake Mary, FL 32746

Hastings - Mixed-Use
New Construction - 20,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Sorrento, FL

O2B Kids
New Construction - 10,970 SF
Pending Verification
New Port Richey, FL

Reed ChildCare
New Construction - 11,936 SF
Conception
$1,200,000 est. value
Stuart, FL 34994

Guidepost Montessori
Renovation - 16,885 SF
Design
Hollywood, FL 33020

The Learning Experience
New Construction - 10,000 SF
Post-Bid
$925,000 est. value
Cooper City, FL 33027

The Goddard School
New Construction, Demolition - 7,193 SF
Construction
$2,930,000 est. value
Tampa, FL 33609

Last Updated 12/27/2021 03:40 PM
Project Title

Temporary Facilities with Delivery and Installation for the Head Start and Early Head Start Program

Physical Address View project details and contacts
City, State (County) Pensacola, FL 32501   (Escambia County)
Category(s) Education
Sub-Category(s) Pre-School/Daycare
Contracting Method Competitive Bids.
Project Status Project Delayed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide a cost to fabricate and/or deliver a facility meeting the following requirements: -1 each 60x24 (56x24 box) 4 offices and 2 Restrooms 60x24 Double Wide Entrance Canopy ADA/IBC Ramp with Switchback Skirting (Installation and Removal) Property Damage Waiver and General Liability Foundation/Tie down plans Tie Downs Block and Level Delivery, Setup, Teardown and Return Delivery -4 each 40x24 (36x24 box) Classroom / 1 restroom 40x24 open classroom (36x24 box) Entrance Canopy ADA/IBC Ramp with Switchback Skirting (installation and removal) Property Damage Waiver and General Liability Foundation/Tie down plans Block and Level Delivery, Setup, Teardown and Return Delivery -Holding Tanks Material- Plastic Capacity- 100-300 Gallons Disposal– Twice weekly The successful bidder will be required to pull all necessary permits, coordinated getting power to the units and reviewing current sewer line connections to determine if DVW lines can be tapped into the existing system.

Details

Pre-School/Daycare, Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents