Similar Projects
Last Updated | 04/27/2023 08:33 PM |
Project Title | Phase I Rehabilitation of County Road 25, Sta. 71+95 to 176+39 and Phase I County Road 08 Cross Culvert Replacement, NY96 to Wayne County Line |
Physical Address | View project details and contacts |
City, State (County) | Canandaigua, NY 14424 (Ontario County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $4,857,056 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work under this contract will include County Road 25 Rehabilitation in the Town of Phelps and replacement of cross culverts on County Road 8 in the Town of Farmington. The work on County Road 25 will consists of replacement of cross culverts, installation of road underdrain system, grading and shaping of roadside ditch section, driveway culverts, heater scarification, milling of bituminous pavement, asphalt paving, guide rail installation and turf establishment. The work on County Road 8 will include the replacement of the following cross culverts, culverts 21, 24, 26, 29, 31, 34, 35 and 37 and other incidental work as shown on the contract drawings. The Contractor's attention is called to the close proximity of utilities at the project site. Culvert #8 on County 25 will be replaced during this project and will require a three (3) week closure of County Road (CR) 25 to ensure the safety of the travelling public and construction crews. At all other times, the road will remain open to through traffic (1-lane minimum) during the construction. Road closure shall not commence before June 26, 2023 and shall end on or before September 1, 2023. Contractor will be allowed to close CR 08 for a maximum of two (2) weeks to install culvert #21 per the Contract Documents. At all other times, the road will remain open to through traffic (1-lane minimum) during the construction. Road closure shall not commence before July 4, 2023 and shall end on or before September 1, 2023. Location: Town of Phelps CR25 STA. 71+95 to 176+39, and Town of Farmington CR8 NY96 to Wayne Cty line Prebid: None Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % Question Acceptance Deadline 02/23/2023 05:00 PM EST Questions are submitted online No Job Location Town of Phelps and Town of Farmington Road Name CR25 & CR8 Questions about or clarifications to the Bid Specifications must be made in writing to the County Purchasing Director prior to the bid opening via regular mail (at the address listed in the Notice to Bidders), e-mail (Purchasing@ontariocountyny.gov ), or fax (585-396-4250).Such questions must be in the possession of the County Purchasing Director three (3)working days prior to the bid opening |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |