Similar Projects
Route 96 Solar Facility
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Clifton Springs, NY 14432

Lake to Lake Road Bridge at Flint Creek - BR01-16 - Ontario County
Infrastructure
Conception
$2,367,700 CJ est. value
Stanley, NY 14561

CR 10 Warehouse
New Construction, Infrastructure - 11,800 SF
Design
$2,000,000 CJ est. value
Canandaigua, NY 14424

Popeye's Louisiana Kitchen / Canandaigua
New Construction, Infrastructure - 2,536 SF
Bidding
$800,000 CJ est. value
Canandaigua, NY 14424

Epoxy Lining Of Potable Water Mains
Infrastructure
Bidding
Canandaigua, NY 14424

Cornell Agriculture and Food Technology Park Food Processing and Manufacturing Facility
New Construction, Infrastructure
Post-Bid
$4,000,000 CJ est. value
Geneva, NY 14456

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Eagle Street Driveway Replacement
Results
Less than $50,000 est. value
Phelps, NY 14532

Brickyard Road Tank and Transmission Main
Alteration
Results
Farmington, NY 14548

Josef's Artisan Meats
Addition, Demolition, Infrastructure - 11,625 SF
Pending Verification
$2,000,000 CJ est. value
Canandaigua, NY 14424

Josef's Artisan Meats
Addition, Demolition, Infrastructure - 11,625 SF
Pending Verification
$2,000,000 CJ est. value
Canandaigua, NY 14424

County Road 25 Rehabilitation - Phase 2 - R08-16 - Ontario County
Infrastructure
Conception
$2,570,000 CJ est. value
Clifton Springs, NY 14432

Canandaigua Airport Access Road
Infrastructure
Bidding
$1,000,000 CJ est. value
Canandaigua, NY 14424

Reliant Federal Credit Union - Site Improvements
Alteration
Post-Bid
Farmington, NY

Crack Sealing
Infrastructure
Results
$900,000 est. value

Last Updated 04/27/2023 08:33 PM
Project Title

Phase I Rehabilitation of County Road 25, Sta. 71+95 to 176+39 and Phase I County Road 08 Cross Culvert Replacement, NY96 to Wayne County Line

Physical Address View project details and contacts
City, State (County) Canandaigua, NY 14424   (Ontario County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $4,857,056 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work under this contract will include County Road 25 Rehabilitation in the Town of Phelps and replacement of cross culverts on County Road 8 in the Town of Farmington. The work on County Road 25 will consists of replacement of cross culverts, installation of road underdrain system, grading and shaping of roadside ditch section, driveway culverts, heater scarification, milling of bituminous pavement, asphalt paving, guide rail installation and turf establishment. The work on County Road 8 will include the replacement of the following cross culverts, culverts 21, 24, 26, 29, 31, 34, 35 and 37 and other incidental work as shown on the contract drawings. The Contractor's attention is called to the close proximity of utilities at the project site. Culvert #8 on County 25 will be replaced during this project and will require a three (3) week closure of County Road (CR) 25 to ensure the safety of the travelling public and construction crews. At all other times, the road will remain open to through traffic (1-lane minimum) during the construction. Road closure shall not commence before June 26, 2023 and shall end on or before September 1, 2023. Contractor will be allowed to close CR 08 for a maximum of two (2) weeks to install culvert #21 per the Contract Documents. At all other times, the road will remain open to through traffic (1-lane minimum) during the construction. Road closure shall not commence before July 4, 2023 and shall end on or before September 1, 2023. Location: Town of Phelps CR25 STA. 71+95 to 176+39, and Town of Farmington CR8 NY96 to Wayne Cty line Prebid: None Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % Question Acceptance Deadline 02/23/2023 05:00 PM EST Questions are submitted online No Job Location Town of Phelps and Town of Farmington Road Name CR25 & CR8 Questions about or clarifications to the Bid Specifications must be made in writing to the County Purchasing Director prior to the bid opening via regular mail (at the address listed in the Notice to Bidders), e-mail (Purchasing@ontariocountyny.gov ), or fax (585-396-4250).Such questions must be in the possession of the County Purchasing Director three (3)working days prior to the bid opening

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents