Similar Projects
Roadway Improvements for Project Dumpling
Post-Bid
Lancaster, SC 29720

Reconstruction/Rehabilitation - District 4
Post-Bid

Preservation - Chesterfield/Lancaster Co
Results

Student Drop Off Loop Extension at Springfield Elementary School
Term Contract
Results
Fort Mill, SC 29715

2021 Full Depth Patching Program
Post-Bid
Lancaster, SC

Possum Hollow Road Improvement Project
Results
$850,000 to $1,050,000 est. value
Lancaster, SC 29720

CTC 2020 Resurfacing Project
Results
$600,000 to $750,000 est. value
Lancaster, SC 29720

Reid Pointe Subdivision Project
Results
SC

Preservation - District 4
Results

Shiloh Unity Road Phase 1 Sales Tax Program 9
Results
Less than $3,204,032 est. value
Lancaster, SC 29720

Reconstruction/Rehabilitation
Results
SC

Lancaster Sales Tax Program - 13 Roads
Results
SC

Lancaster County Glen Laurel Pavement Preservation
Results
Less than $314,270 est. value
Lancaster, SC 29720

JB Denton Road Improvement Project Phase I
Results
Lancaster, SC 29720

Lancaster County Convenience Site Paving
Results
Lancaster, SC 29720

Last Updated 11/11/2020 02:33 PM
Project Title

Intersection Improvement - SC 522 and S-123

Physical Address View project details and contacts
City, State (County) SC   (Lancaster County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Construction Stakes, Lines & Grades 1.000 Ea Large Public Water Relocation No. 001 1.000 Ea Traffic Control 1.000 Ls Cpm Progress Schedule 1.000 Ls Clearing & Grubbing Within Right Of Way 1.000 Ls Unclassified Excavation 2,781.000 Cy Borrow Excavation 3,393.000 Cy Fine Grading 2,608.600 Sy Flowable Fill 99.700 Cy Maintenance Stone 550.000 Ton Hot Mix Asphalt Base Course - Type b 1,255.000 Ton Liquid Asphalt Binder Pg64-22 220.000 Ton Full Depth Asph. Pav. Patching 8" Unif 1,000.000 Sy Milling Existing Asphalt Pavement 2.0" 2,100.000 Sy Milling Existing Asphalt Pavement (Variable) 1,619.150 Sy Hot Mix Asphalt Intermediate Course Type c 840.000 Ton Hot Mix Asphalt Surface Course Type c 830.000 Ton Hot Mix Asphalt Surface Course Type e 10.000 Ton Driveway Paving-Surface Type c Non-Resurfacing Project 490.000 Ton Stained Concrete Pavement (8" Uniform) 117.000 Sy Construction Zone Electric Changeable Message Sign For Maint 4.000 Ea Permanent Construction Signs (Ground Mounted) 336.000 Sf Pavement Markings (Temporary Paint) 24"x36" White Triangle Yield Bar 96.000 Lf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 164.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 6,900.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 10,000.000 Lf 6" Yellow Solid Line On Curb/Median - Fast Dry Paint 1,007.000 Lf 4" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 45.000 Lf 8" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 64.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 2,200.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 78.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 5,002.000 Lf 24" Yellow Solid Lines - Thermoplastic - 125 Mil. 200.000 Lf Permanent Yellow Pavement Markers Mono-Dir.- 4"x 4" Perm. Yel. 150.000 Ea Flat Sheet, Type Iii, Size Determined By Msg 18.000 Sf Flat Sheet,Type-Viii,Ix, Or Xi, Fluor Fixed Size & Msg. 279.760 Sf u-Section Post For Sign Supports - 3p 678.000 Lf Reflective Sign Post Panels 82.000 Lf 48" r. c. Pipe Cul. Beveled End Sectn-Cl 3 1.000 Ea 18" Smooth Wall Pipe 1,412.000 Lf 24" Smooth Wall Pipe 699.000 Lf 36" Smooth Wall Pipe 128.000 Lf 42" Smooth Wall Pipe 176.000 Lf 48" Smooth Wall Pipe 72.000 Lf Catch Basin -Type 1 Cb - Type 1 4.000 Ea Catch Basin -Type 16 14.000 Ea Catch Basin -Type 17 3.000 Ea Catch Basin -Type 18 2.000 Ea Drop Inlet (24" x 36") 10.000 Ea Manhole 4.000 Ea Manhole With Standard 4` x 4` Box 1.000 Ea Beveling Of Pipe End 17.000 Ea Concrete Curb (9" x 15") 336.000 Lf Concrete Curb And Gutter(2`-0") Vertical Face 1,405.000 Lf Concrete Median 3,345.000 Sy Rip-Rap (Class a) 73.000 Ton Rip-Rap (Class b) 462.900 Ton Geotextile Fabric For Erosion Control Under Riprap (Class 2) 106.900 Sy Geotextile For Erosion Control Under Riprap(Class 2)Type c 509.000 Sy Right Of Way Marker(Rebar And Cap) 35.000 Ea Right Of Way Plat 1.000 Ls Permanent Cover 1.290 Acre Temporary Cover 0.645 Acre Seeding - Eragrostis Curvula - Weeping Lovegrass 0.063 Msy Fertilizer (Nitrogen) 145.000 Lb Fertilizer (Phosphoric Acid) 145.000 Lb Fertilizer (Potash) 145.000 Lb Agricultural Granular Lime 2,570.000 Lb Selective Watering 54,300.000 Gal Mowing 3.870 Acre Double-Shredded Hardwood Mulch 452.390 Sf Muhlenbergia Capillaris (Pink Muhly Grass) #1 Cont. 50.000 Ea Turf Reinforcement Matting (Trm) Type 1 0.230 Msy Temporary Erosion Control Blanket (Class a) 5.158 Msy Hydraulic Erosion Control Product (Hecp) - Type 2 0.212 Acre Silt Fence 962.000 Lf Cleaning Silt Basins 283.000 Cy Cleaning Inlet Structure Filters 60.000 Ea Inlet Structure Filter - Type a 874.000 Lf Aggregate No.5 Or 57 For Erosion Control 23.600 Ton Stabilized Construction Entrance 550.000 Sy

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents