Similar Projects
New Discovery District Facility
New Construction - 50,000 SF
Conception
$15,000,000 est. value
Sioux Falls, SD

Cybersecurity Program Lab Construction
New Construction
Conception
Sioux Falls, SD

Business & Innovation Center
New Construction
Design
$29,500,000 est. value
Aberdeen, SD

Richardson Hall Interior Phase 5
Renovation
Design
Vermillion, SD 57069

SDSU Anatomy Laboratory
Renovation, Addition
Post-Bid
Brookings, SD

Fine Arts North Sculpture Yard
Renovation
Post-Bid
$160,000 est. value
Vermillion, SD

EY Berry Library and Learning Center
Renovation
Results
Spearfish, SD 57783

Lee Med Health Sciences Basement
Renovation
Results
$450,000 est. value
Vermillion, SD 57069

Augustana University Hockey Arena
New Construction
Pending Verification
Sioux Falls, SD

Center for Student Engagement Remodel
Renovation
Post-Bid
Watertown, SD 57201

East Hall - Phase II
Renovation
Results
$2,900,000 to $3,100,000 est. value
Pierre, SD 57501

He Sapa College Center Steel Roof, Gutters, and Siding Replacement
Renovation, Alteration
Post-Bid
Rapid City, SD 57701

SJAC Kurtenbach Wrestling
Addition
Results
Brookings, SD

CM at Risk for Lincoln Hall School of Business
New Construction - 5,000 SF
Post-Bid
$29,500,000 est. value
Aberdeen, SD 57401

Deubrook Area Schools Track and Field
Renovation, Addition
Results
Brookings, SD

Last Updated 07/06/2022 12:56 AM
Project Title

Student Center, Gas Fireplace Replacement

Physical Address View project details and contacts
City, State (County) Aberdeen, SD 57401   (Brown County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. The prime contractor shall furnish all labor, materials, equipment and service and perform all of the work of each respective contract as shown on the drawings and specified in the specifications prepared by Sichmeller Engineering, Aberdeen, South Dakota and their consultants. B. Contractors shall, prior to start of work, set the work schedule and sequence with the owner and secure approval of same. Suitable access to and from existing building and all other areas must be provided at all times. C. Prime contractors shall cooperate with each other to insure a smooth running, well organized project.

Details

College/University, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents