Similar Projects
Missionary Village Lift Station Improvements - 6022386 - Manatee County
Alteration
Design
$2,226,000 est. value
Bradenton, FL 34212

Nassau Water Reclamation Facility (WRF) Exploratory Injection Well
Infrastructure
Bidding
$950,000 est. value
Jacksonville, FL

Plugging and Abandonment of Orphaned Oil and Gas Well (Sevier 14-1)
Infrastructure
Bidding
$250,000 to $500,000 est. value
Spring Hill, FL 34611

Wet Well Cleaning
Post-Bid
North Port, FL

Well Testing, Drilling And Maintenance
Demolition, Term Contract
Post-Bid
FL

Well House Replacement - Contract II
Results
Less than $150,000 est. value
Cottondale, FL 32431

New Condenser Water Return Well No.2
Term Contract
Results
Tallahassee, FL 32307

Springtree Biscayne Aquifer Well S-23
Infrastructure
Bidding
$176,251 est. value
Sunrise, FL 33351

Progressive Cavity Pump - Sludge Feed Pump
Post-Bid
Port Saint Lucie, FL

Mechanical Integrity Testing of the SRPF, WTP 11, and SROC Deep Injection Well Projects
Results
$145,000 est. value
Belle Glade, Boca Raton, Delray Beach, FL

Boiler and Booster Pump Replacement at Municipal Service Center
Alteration
Bidding
$200,000 est. value
Saint Petersburg, FL 33701

Well Boring and Drilling
Post-Bid
Tampa, FL

Pump Rehabilitation and Repair
Results
Cape Coral, FL 33915

C Basin High Service Pump and Motor Replacement
Infrastructure
Bidding
$350,000 est. value
Bradenton, FL 34212

Flygt and ABS Pumps, Parts and Repairs
Post-Bid
FL

Reported 06/29/2022 12:00 AM
Project Title

Well No. 5 Replacement

Physical Address View project details and contacts
City, State (County) Destin, FL   (Okaloosa County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work included in this control generally consists of the construction of a 1200-1300 GPM water supply well, pump controls, building, piping, grassing, grading aggregate, electrical, mechanical, valves, etc. in accordance with the plans and specifications.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents