Similar Projects
Last Updated | 11/19/2020 03:04 PM |
Project Title | 2020 Drainage System Maintenance |
Physical Address | View project details and contacts |
City, State (County) | Havelock, NC 28532 (Craven County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Maintenance must include regrading, digging, dredging, excavating, mowing and grubbing of obstructions, sedimentation and debris including, but not limited to: removal of grass, brush, shrubs, dirt, trees (less than 6 inches in diameter), loose debris and other encumbrances. A minimum of 6 inches of topsoil shall be removed along the entire length of all areas. Ground level should be established at the invert level of all existing drainage pipes. All work will be performed within the existing right-of-way. Dirt and debris shall be removed from all road culverts/pipes that are contiguous to ditches. Maximum care shall be taken while excavating to avoid any damages to natural flows, erosion of disturbed areas and offsite sedimentation is to be absolutely minimized. Locations: Area 1: Gray Fox Rd.: From Fox Ridge to East Prong Slocum Creek approximately 2565ft. Area 2: Brown Blvd.: From Webb Blvd. to McCotter Blvd. approximately 2063ft. Area 3: Tarheel Dr.: From Webb Blvd. to McCotter Blvd. approximately 2189ft. Area 4: N. Shepard St.: From Hwy. 70 to Brown Blvd. approximately 1107ft. Area 5: Keith Dr.: From Webb Blvd. to McCotter Blvd. approximately 2896ft. Area 6: Kyle Dr.: From Shipman Rd. to McCotter Blvd. approximately 1506ft. Area 7: Nunn St.: From Hwy. 70 to Webb Blvd. approximately 2338ft. Area 8: Dogwood St.: From Hwy 70 to Webb Blvd. approximately 2533ft. Area 9: Forest Hill Dr.: From Hwy 70 to McCotter Blvd. approximately 4352ft. Area 10: McCotter Blvd.: From Rice Ln. to Brown Blvd. approximately 1114 1ft. Area 11: Pineview St.: From Hollywood Blvd. to Joes Branch approximately 1470ft. Area 12: Speight St.: From Hwy 70 to Shepard St approximately 3106ft. Area 13: Karol St.: From Shepard St. to Speight St. approximately 2566ft. Area 14: Shepard St.: From Hollywood Blvd. to South Forest Dr. approximately 3574ft. Area 15: Kim Ave.: From Webb Blvd. to McCotter Blvd. approximately 1604ft. Area 16: Pirates Ln.: From Tarheel Dr. to McCotter Blvd. approximately 1938ft. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |