Similar Projects
Parrish Farms - Master Plan
New Construction - 4,000,000 SF
Conception
$10,000,000 CJ est. value
FL

Carlton Place
New Construction - 865,665 SF
Conception
Clewiston, FL 33440

Industrial Office/Warehouse
New Construction - 22,960 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Saint Lucie West, FL 34986

Foundry Delivery Station Warehouse
New Construction - 112,104 SF
Design
$10,000,000 CJ est. value
Opa-locka, FL 33054

Industrial Workshop Building
New Construction - 64,000 SF
Conception
Tampa, FL 33616

Hulett Place
New Construction, Addition - 25,204 SF
Design
$4,010,000 est. value
West Palm Beach, FL 33411

Klus Design Facility
New Construction, Infrastructure
Conception
$9,500,000 CJ est. value
Vero Beach, FL 32968

Interstate Commerce Center
New Construction, Build-Out - 207,458 SF
Design
$10,000,000 CJ est. value
Fort Pierce, FL 34945

Billfish Air Conditioning
New Construction, Build-Out
Conception
Palm City, FL 34990

Amazon Distribution Facility
New Construction - 221,115 SF
Design
$10,000,000 CJ est. value
Port Saint Lucie, FL

KZ Copans Industrial
New Construction - 509,414 SF
Conception
$10,000,000 CJ est. value
Pompano Beach, FL 33064

Portman Industrial
New Construction, Demolition - 8,635,984 SF
Design
Jupiter, FL 33478

Suncoast Trucking School
New Construction, Demolition - 4,500 SF
Conception
Punta Gorda, FL

Gray Motorsports
New Construction - 45,067 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Jupiter, FL 33458

Prologis Beacon Lakes - Building 46
New Construction - 553,705 SF
Conception
Miami, FL 33106

Last Updated 03/27/2023 08:51 AM
Project Title

RFP D/B - Relocate STA Yankeetown

Physical Address View project details and contacts
City, State (County) Yankeetown, FL 34498   (Levy County)
Category(s) Government/Public, Heavy and Highway, Industrial/Manufacturing, Transportation
Sub-Category(s) Aircraft Hangar, Dock/Pier/Marine, Industrial Warehouse, Military Facility
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $40,000,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

This project will relocate and rebuild waterfront and shore facilities currently located at US Coast Guard Station Yankeetown, FL as a result of damages sustained during Hurricane Michael. The shore work includes, but is not limited to construction of new Station Building, covered boat storage facility, site development, storm water management, paving/parking, utilities, fire protection system, sewage treatment system, security fencing, furniture and outfitting. The waterfront work includes but is not limited to: dredging, shoreline protection, boat launch, covered mooring structure and floating dock support for two (2) rescue boats; a 29-ft R B -S and a 45-ft RB-M Question Deadline 02/24/2023 If you have any questions, please contact Ethan Putman, Historic Sites Specialist, by email at Ethan.Putman@dos.myflorida.com. Trades include, but are not limited to: Sitework, concrete, masonry, structural steel, roofing, doors-frames-hardware, drywall, flooring, acoustics, painting, specialties, FFE, plumbing, mechanical, electrical, paving and exterior improvements. FOR DHS NMACC II CONTRACT HOLDERS ONLY -This project will relocate and rebuild waterfront and shore facilities currently located at U.S. Coast Guard Station Yankeetown, FL as a result of damages sustained during Hurricane Michael. The shore work includes, but is not limited to: construction of a new Station Building, covered boat storage facility, site development, storm water management, paving/parking, utilities, fire protection system, sewage treatment system, security fencing, furniture, and outfitting. The waterfront work includes, but is not limited to: dredging, shoreline protection, boat launch, covered mooring structure and floating dock support for two (2) Rescue Boats; a 29-ft RB-S and a 45-ft RB-M. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Addendum #1-#7 have been issued as of 3-20-2023.

Details

Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents