Similar Projects
Signing and Delineation - Gravel Roads
Infrastructure
Conception
$1,507,000 est. value
McIntosh, SD

Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$3,922,000 CJ est. value
Tyndall, SD 57066

Wastewater Improvement Project
Infrastructure
Design
$70,000 CJ est. value
Pickstown, SD 57367

Wastewater Improvement Project
Infrastructure
Design
$70,000 CJ est. value
Pickstown, SD 57367

Mill and AC Resurfacing
Infrastructure
Bidding
$2,796,000 CJ est. value
Lake Andes, SD 57356

Wagner Picnic Shelters
Infrastructure
Bidding
$150,000 CJ est. value
Wagner, SD 57380

Geddes Consolidation Project Phase 3: 3.0 MG Ground Storage Reservoir
Post-Bid
$1,850,000 est. value
SD 57369

BIA 3400 Little Eagle Loop
Post-Bid
$980,000 est. value
Little Eagle, SD

10th Avenue North Reconstruction
Results
$1,500,000 to $2,500,000 est. value
Watertown, SD 57201

Water Main Replacement 2021
Results
Huron, SD

Bond New Elementary School - Vermillion School District 13-1
Demolition, New Construction, Renovation, Infrastructure
Construction
$26,000,000 CJ est. value
Vermillion, SD 57069

2022 Bond - Brookings School District
New Construction, Build-out, Infrastructure
Pending Verification
$23,000,000 CJ est. value
Brookings, SD 57006

GA Apron Reconstruction Phase I, Aberdeen Regional Airport
Infrastructure
Pending Verification
$500,000 CJ est. value
Aberdeen, SD 57401

Shoulder Widening, Mill, AC Resurfacing, Replace Str Bridge, Approach Grading, Pipework; Signal, Crossing Surface
Infrastructure
Conception
$12,000,000 CJ est. value
Elkton, SD 57026

Florence School Expansion - Florence School District 14-1
Addition, Demolition, Infrastructure
Design
$5,000,000 CJ est. value
Florence, SD 57235

Last Updated 09/07/2022 06:02 AM
Project Title

Sanitary Sewer System Improvements and Expansion

Physical Address View project details and contacts
City, State (County) Grenville, SD 57239   (Day County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $3,200,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Expansion of existing collection system by installing 3,776 ft of 8 Sewer main, 2,337 Ft of 4 Service Pipe, Trench Dewatering, and Removal of 62 existing Septic/Holding Tanks and necessary manholes, fittings, valves and appurtenances. In addition, this project includes refurbishing 12 existing lift stations and replacement of one existing lift station, including new pumps, valves, controls and appurtenances and refurbishing of 25 existing air release manholes. This project also includes the installation of a master SCADA system. Bidders on this work will be required to comply with the Presidents Executive Order Nos. 11246 as amended, 11518, and 11625 as amended. The requirements for bidders and contractors under these orders are explained in the specifications. The low responsive bidder will be required to certify to compliance with the American Iron and Steel provision of the Consolidated Appropriations Act of 2014. This certification form may be found on page AIS-21 of the State Revolving Fund (SRF) General Conditions and must be included in the bid proposal. Please be advised that waivers or exemptions from the American Iron and Steel provision that cite International Trade Agreements DO NOT comply with the Consolidated Appropriations Act of 2014 as it applies to the SRF programs. Claims from suppliers that the American Iron and Steel provision does not apply to certain products based on the International Trade Agreement exemptions of the Consolidated Appropriations Act of 2014 will not be accepted. Bidders on this work will be required to comply with Title 40 CFR 33 and Executive Order 12138. The requirements for bidders and contractors under this regulation which concerns utilization of Disadvantaged/Minority Business Enterprises (DBE/MBE) and Womens Business Enterprises (WBE) are explained in the specifications. The goals for DBE/MBE participation are one percent and WBE participation are four percent. Bidders are also reminded that not less than the minimum wages as determined by the Davis Bacon Act and set forth in the Contract Documents must be paid on this project and that the contractor and/or subcontractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex or national origin. In addition to all of the above listed Federal requirements for work on this project, compliance with the contract Work Hours and Safety Standards Act, Executive Order 11375, Copeland Act, the Clean Air Act and Water Pollution Control Act and subsequent amendments to all of the above will be required of contractors and/or subcontractors performing work on this project. Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All listed iron and steel products used in this project must be produced in the United States. The term iron and steel products means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials. The deminimis and minor components waiver {add project specific waivers as applicable} apply to this contract. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents