Similar Projects
SH 80
Infrastructure
Conception
$287,028 CJ est. value
Luling, TX 78648

FM 20
Infrastructure
Conception
$395,260 CJ est. value
Martindale, TX 78655

O'Reilly Auto Parts (LLG) / Luling TX
New Construction, Infrastructure - 7,082 SF
Design
$1,000,000 CJ est. value
Luling, TX 78648

Elementary School 6 - 2022 Bond - Lockhart Independent School District
New Construction, Infrastructure
Design
$41,153,652 CJ est. value
Lockhart, TX 78644

Lockhart 2023 Street Improvements
Infrastructure
Bidding
$822,280 CJ est. value
Lockhart, TX 78644

Construction of Hartland Ranch Phase 1 Wastewater Improvements
Infrastructure
Post-Bid
$400,000 CJ est. value
Lockhart, TX 78644

Waterstone Phase 2
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Maxwell, TX 78656

Fire Training Facility
New Construction, Infrastructure - 4,529 SF
Results
$2,777,777 CJ est. value
San Marcos, TX 78666

Phase 1B - Segment D Pipeline
Infrastructure
Results
$14,927,727 CJ est. value
Lockhart, TX 78644

White Water Express / Lockhart
New Construction, Infrastructure - 4,405 SF
Construction
$1,700,000 CJ est. value
Lockhart, TX 78644

2022 Sidewalk Improvements Project
Infrastructure
Construction
$199,600 CJ est. value
Lockhart, TX 78644

Hershey Creamery Company Cold Storage Facility / Lockhart
New Construction, Infrastructure - 20,000 SF
Pending Verification
$11,000,000 CJ est. value
Lockhart, TX 78644

Borchert Loop Apartment / Lockhart
New Construction, Infrastructure
Pending Verification
$90,000,000 CJ est. value
Lockhart, TX 78644

FM 1977
Infrastructure
Conception
$2,000,000 CJ est. value
Martindale, TX 78655

Lockhart High School Expansion - 2022 Bond - Lockhart Independent School District
Addition, Demolition, Infrastructure
Design
$28,825,226 CJ est. value
Lockhart, TX 78644

Last Updated 07/24/2023 02:32 PM
Project Title

Lockhart Industrial Park 130

Physical Address View project details and contacts
City, State (County) Lockhart, TX 78644   (Caldwell County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $365,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for new construction of four industrial buildings totaling 680,000-square-feet. The first building, at 168,000-square-feet is currently under construction. As of April 2023, the remaining buildings are in design and planning. No development applications or building permits have been submitted into the City of Lockhart. A general contractor has been selected. A firm construction timeline has not been set; however, construction is not expected to begin prior to late 2023.

Details

512,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents