Similar Projects
Broad Street Retaining Wall - 23-12 - City of Bristol
Infrastructure
Conception
$1,800,000 est. value
Bristol, CT 06010

Arch Street Downtown Complete Streets Improvements - City of New Britian
Infrastructure
Conception
New Britain, CT

Cheshire Community Ymca
Alteration
Design
Southington, CT 06489

Civil and Paving Multiple Award Construction Contract
Term Contract
Bidding
$250,000 to $500,000 est. value
Camp Lejeune, Jacksonville, NC

Ridgewood St - Griswold St Area Improvements
Infrastructure
Bidding
$1,294,940 est. value
Manchester, CT 06040

Site Upgrades at Elms Village, The Highlands, Rochambeau Apartments
Post-Bid
Hartford, CT 06108

Tromley Road Reconstruction
Post-Bid
Windsor, CT

Highland Street Pavement Rehabilitation - Rocky Hill Town Line to Thornbush Road
Results
Less than $869,127 est. value
Wethersfield, CT

Town Center Sidewalks - Jones Hollow Road, Cheney Road & North Main Street - Contract 1
Results
$175,000 to $225,000 est. value
Marlborough, CT

Relocation of Pan Am At-Grade Crossing - City of New Britain
Infrastructure
Conception
$398,000 est. value
New Britain, CT

New Parking Lot at Gaylord Towers
Post-Bid
Bristol, CT 06010

Pitkin Street Sidewalk Replacement Project
Results
East Hartford, CT 06108

Stanley Quarter Park Phase II Pave Roadways and Phase III Pave Parking Lots and Install Lighting - City of New Britain
Renovation, Infrastructure
Conception
$1,400,000 est. value
New Britain, CT 06053

Contractor Rate Submittal to Public Works for 2021-2023
Term Contract
Post-Bid
Suffield, CT

2021 Permanent Street Curbing Installation
Results
West Hartford, CT

Last Updated 07/21/2022 03:17 PM
Project Title

Bloomfield Tariffville Multi-Use Trail Connector Project

Physical Address View project details and contacts
City, State (County) Simsbury, CT 06081   (Hartford County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $2,990,724 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 21, 2022, this project has not yet been awarded. A timeline for award has not yet been established. The project is approximately 0.87 miles of paved 10 foot wide recreational trail, intersection improvements and related work. The project begins approximately 600 linear feet west of State Route 189 and connects to an existing multi-use trail in Bloomfield. The trail then continues north along State Route 189 for approximately 0.75 miles to the intersection with Main Street in Tariffville. Included in the project are drainage improvements, a landscaping buffer along the trail route, intersection improvements and traffic signal modifications at the intersection of State Route 189/315 (Elm Street), sidewalk improvements, and the installation of bike racks and the construction of a retaining wall at the northern terminus of the multi-use trail. Bid Security in the amount of 5 percent (5%) of the Bid must accompany each bid, in accordance with the Bid Instructions and Information. The successful bidder will be required to furnish Performance and Labor and Materials Payment bonds, each in amount equal to 100 percent (100%) of the contract price. No Bidder may withdraw his Bid within 90 days after the actual date of the opening thereof. Pursuant to CGS 31-53, the successful bidder will be responsible for paying prevailing wages, as determined by the Connecticut Department of Labor, and included in the Bid Documents, in association with this project The Town of Simsbury is an Affirmative Action/Equal Opportunity Employer. MBE's, WBE's and SBE's are encouraged to apply. State law requires a minimum of twenty-five (25%) percent of the state-funded portion of the contract for award to subcontractors holding current certification from the Connecticut Department of Administrative Services ("DAS") under the provisions of CONN. GEN. STAT. 4a60g. (25% of the work with DAS certified Small and Minority owned businesses and 25% of that work with DAS certified Minority, Women and/or Disabled owned businesses.) The contractor must demonstrate good faith effort to meet the 25% set-aside goals The anticipated state funding contribution for this project is $1,517,400. Any questions regarding the proposed work should be addressed, in writing, to: Mr. Thomas J. Roy, Director/Town Engineer, at troy@simsbury-ct.gov. Questions will not be entertained past 3:00 p.m., May 20, 2022, and responses will be posted via addendum. The Town reserves the right to reject any or all Bids, or to accept any Bid, should the Town deem it to be in the best interest of the Town. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents