Similar Projects
Ham Wilson Arena - Facilities Management Training Facility Renovations
Renovation
Bidding
Auburn, AL 36849

Emergency Mitigation Recovery and Restoration Services
Renovation
Post-Bid
Auburn, AL 368495101

HAC Building - Elevator Upgrades and Renovations for Southern Union State Community College
Renovation
Post-Bid
Opelika, AL 36801

Miller Poultry Center - Poultry Relocation Project (Phases III-VI) - Bid Package 2
Results
Auburn, AL

New Maintenance Shop for Southern Union State Community College
New Construction
Results
Opelika, AL 36801

Miller Poultry Center - Poultry Farm Relocation Project (Phases III-VI)
Construction
Less than $18,030,000 est. value
Auburn, AL

Rane Culinary Science Center - New Building
New Construction - 142,000 SF
Construction
Less than $110,000,000 est. value
Auburn, AL 36849

Comer Hall - Comprehensive Renovation (Phase I)
Renovation
Post-Bid
Auburn, AL 36849

Student Center - Rooms 3101 and 3130, Renovations for Student Involvement
Renovation
Results
Auburn, AL

Academic Classroom & Laboratory Complex (ACLC) New Facility
New Construction - 496,000 SF
Construction
Less than $83,000,000 est. value
Auburn, AL 36830

A New One-Stop Center for Southern Union State Community College Renovations to the Opelika Campus Administration Building
Renovation - 15,200 SF
Results
Opelika, AL 36801

Advanced Structural Testing Laboratory - New Facility
New Construction
Construction
Less than $22,000,000 est. value
Auburn, AL

Concrete Moist Cure Room
Addition
Results
Less than $61,375 est. value
Auburn, AL

Central Dining Facility New Building General Works Package
New Construction - 200,000 SF
Construction
Auburn, AL 36830

Gavin Engineering Research Lab - Basement, Investigate and Resolve Water Intrusion Issues
Results
Auburn, AL 36849

Last Updated 06/07/2020 10:17 PM
Project Title

Leach Science Center - Butler Building Addition, New HVAC System and Fire Alarm System

Physical Address View project details and contacts
City, State (County) Auburn, AL 36849   (Lee County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The general scope of the work includes but is not limited to: 1.Replacement of four(4) air handling units (AHU) located in Butler building section of Leach Science Center with one(1) externally mounted unit; Provide hydronic VAV boxes throughout the building for individual zone climate control 2. Replacement existing fire detection and alarm system with new fire alarm and mass notification system. 3. Electrical support of Mechanical portion of work. 4. Replacement of existing light fixtures with LED fixtures in areas where ceiling is removed for HVAC upgrade 5.Paint exterior of building to match the finish of the recent Leach Science Center addition.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents