Similar Projects
Last Updated | 10/11/2022 10:08 AM |
Project Title | Zeeland Public Schools - Bid Package 3B - Bid Category 14 Rebid |
Physical Address | View project details and contacts |
City, State (County) | Zeeland, MI 49464 (Ottawa County) |
Category(s) | Single Trades |
Sub-Category(s) | Flooring |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | Construction Manager |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Cityside MS Renovations, East HS PE Addition & Renovations West HS PE Renovations - Bid Package 3B (Bid Category 14 - Flooring - Rebid) The Project consists of interior building renovations to Cityside Middle School, a fitness addition and renovations to East High School, and fitness renovations to West High School for Zeeland Public Schools 2021 Bond Issue. Bid proposals were previously received on 08/08/2022 for Bid Categories 01 thru 21 and have been awarded to successful bidders. This bid proposal issuance is strictly for the re-bidding purposes related to Bid Category 14 - Flooring ONLY. A Pre-Bid Conference is currently not planned at this time. One can be scheduled based on bidder demand. If you desire need to see existing buildings and conditions, please reach out in advance and by Friday 10/30/2022 for allowing time to schedule a time: Dave Fleece - 616-566-3806 Email: davef@oakmi.com Locations- 320 E. Main St. (Cityside MS) - TOTAL RENOVATED PROJECT: 15,376 SQ. FT 3333 96 th Ave. (East HS) - TOTAL RENOVATED PROJECT: 11,432 SQ. FT. 3390 100 th Ave. (West HS) Zeeland, MI 49464 - ATHLETICS FITNESS ADDITION: 6,655 SQ. FT. ; ATHLETICS INTERIOR RENOVATIONS: 4,500 SQ. FT. 1. Tiling, Resilient Base and Accessories, Resilient Athletic Flooring, Sheet Carpeting 2.Minor preparation of floor and wall surfaces such as grinding, patching, latexing, latence, scum and paint removal, etc. 3. Final cleaning of tile surfaces. 4. All required trims, reducers and base related to all flooring material types and specifications. 5. Caulking of control joints in tile surfaces. 6. Include all setting beds as required for achieving finish floor elevations shown and/or required to match existing finish floor elevations. 7. Moisture testing prior to all flooring installations. Forward testing reports to CM and Architect. 8. Include floor patching work with owner stock at locations shown on drawings. 9. Include logo/graphics at lifting drop zones/stations on athletic flooring in weight rooms. 10. Provide unit cost ($/SF) on bid form to apply a ASTM F3010-qualified Moisture Vapor Emission Control system. Project No- 21-171.55, 1510128.5A |
||
Details | 37,963 SF.
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |