Similar Projects
Bio - Chemistry Chillers Replacement HVAC Controls - Ohio University
Renovation, Alteration
Conception
$2,000,000 est. value
Athens, OH 45701

Replace HVAC Squad Ops Building
Alteration
Design
$5,000,000 est. value
Springfield, OH

Clermont Metropolitan Housing Authority Scattered Sites HVAC Replacement - Rebid 1
Renovation
Design
$400,000 CJ est. value
Batavia, OH 45103

Purchase of HVAC Air Filters and Belts
Term Contract
Sub-Bidding
Cleveland, OH 44115

Replacement Heating, Ventilation, and Air Conditioning (HVAC) System for Brown County 9-1-1 Communications Center
Renovation
Sub-Bidding
$600,000 CJ est. value
Georgetown, OH 45121

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Public Auditorium Music Hall Air Handling Units
Results
$950,000 est. value
Cleveland, OH 44114

OU Alden Library Air Handler Replacement Upgrades
Results
$1,020,000 est. value
Athens, OH 45701

HVAC Technical Services for Forced Air Furnaces
Term Contract
Post-Bid
Cleveland, OH

Nagel MS Cooling Tower Replacement
Results
Cincinnati, OH

HVAC Replacements - FY2020
Post-Bid
Less than $2,800,000 est. value
Columbus, OH

Scioto Ridge Elementary School Chiller Replacement
Results
Powell, OH 43065

Replacement Filters
Term Contract
Post-Bid
Columbus, OH

Industrial Air Quality Testing Services
Results
Bratenahl, Cleveland, OH 44199

Last Updated 08/26/2022 02:02 PM
Project Title

Steam Boiler Demolition and Installation Project

Physical Address View project details and contacts
City, State (County) Canton, OH 44702   (Stark County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $120,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

1. The Project and Work for the Project consists of all labor, materials, equipment, and services necessary for construction of the project identified as Demolition and installation of one steam boiler at the Civic Center Project, all in accordance with the Drawings and Specifications prepared by the Engineer and/or Owner. The Project must be substantially complete by the Date for Substantial Completion set forth in Section Q below. 2. The Mayor has determined that a Project Labor Agreement will advance the Citys procurement interest in cost, efficiency, and quality while promoting labor-management stability as well as compliance with applicable legal requirements governing safety and health, equal employment opportunity, labor and employment standards, and other related matters. Any such PLA shall be negotiated by the Mayor of the Owner with the East Central Ohio Building and Construction Trades Council and its affiliated local unions, or said Councils successor. The successful Bidder shall comply with and adhere to all of the provisions of any PLA for the Project. The successful Bidder, who, as a Bid Guaranty, submits a certified check, cashiers check, or irrevocable letter of credit in an amount equal to 10% of the bid, shall furnish a Contract Bond in the form included in the Contract Documents in an amount equal to 100% of the Contract Sum. NOTE: AIA or EJCDC Bond forms are not acceptable. Bid Bond or Payment and Performance Bond forms are not acceptable for this Project. All bids must include a Bid Guaranty, as described in the Instructions to Bidders. Prevailing wage rates apply. All bidders will be required to comply with the City Contract Compliance Program regarding equal employment opportunity. After submission and opening, no bidder may withdraw its bid within 60 days after the opening; the City reserves the right to waive irregularities, reject any or all bids, and conduct necessary investigations to determine bidder responsibility. DATE OF SUBSTANTIAL COMPLETION. The Project and Work for the Project consists of all labor, materials, equipment, and services necessary for construction of the Project, all in accordance with the Drawings and Specifications prepared by the Owner or Engineer. The Contractor shall achieve Substantial Completion of its Work on the Project, as defined in the General Conditions, within 90 calendar days of the Date of Commencement ("Date of Substantial Completion"), no later than 12/25/2022. DATE OF FINAL COMPLETION. The Contractor shall achieve Final Completion of its Work on the Project, as defined in the General Conditions, within 30 calendar days of the Date of Substantial Completion ("Date of Final Completion").

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents