Last Updated 12/10/2019 11:20 AM
Project Title

Plantwide Electrical Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Bridgewater, NJ 08807   (Somerset County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 06/20/19
Owner View project details and contacts
Architect View project details and contacts
Description

The term of the Contract shall be for a period anticipated to commence on or about August 2019 and shall continue through February 2021 for a total of 540 calendar days. The Scope of Work shall include 10 separate work groups that will upgrade the motor control and electrical components of the Wastewater Treatment Plant. The work groups are bundled as follows: WORK GROUP 1 Plant Outdoor and Indoor Lighting; WORK GROUP 2 Administration Building: Consolidate all motor controllers into a single motor control center; WORK GROUP 3 Influent Pump Station Electronic Variable Speed Drives: Replace and wire (3 each) new replacement 190HP (300A) drives; WORK GROUP 4 Primary Clarifiers 1-5 (Existing).

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents