Similar Projects
North Section Rehabilitation - NP-GWMP 1(3), 2(5)
Bidding
$100,000,000 est. value
Arlington, VA

North Section Rehabilitation - NP-GWMP 1(3), 2(5)
Bidding
$100,000,000 est. value
Arlington, VA

Buckingham Branch Railroad Request for Bids Buckingham Division Buckingham Branch
Renovation
Post-Bid
Dillwyn, VA 23936

Repair Pentagon Transit Center (PTC) Bridge
Post-Bid
$10,000,000 to $25,000,000 est. value
Arlington, VA

Rehabilitation of Granby Street Bridge
Results
$5,824,129 to $5,969,035 est. value
Norfolk, VA 23510

Waterloo Historic Bridge Restoration over Rappahannock River
Results
Less than $5,547,126 est. value
VA

Bridge Superstructure Replacement and Rehabilitation Bundling Design-Build Project
Bidding
Richmond, VA

Bridge Maintenance and Repair
Term Contract
Post-Bid
Newport News, VA

Churchland Bridge Replacement Project
Results
$29,500,000 est. value
Portsmouth, VA 23701

Proposed Bridge Repair of EBL Riverside Drive Over Sandy River
New Construction
Bidding
Danville, VA

Construction of the University Drive Over NSRR Rehabilitation and Approach Modifications
Post-Bid
Radford, VA

Botanical Gardens Cobblestone Bridge Replacement
Results
Less than $1,496,825 est. value
Norfolk, VA 23510

SGR - Bridge Replacement Over Lickinghole Creek
New Construction
Bidding
$1,215,000 est. value
VA

Freeman Store Pedestrian Bridge
Post-Bid
$500,000 to $749,999 est. value
Vienna, VA 22180

SGR Major Bridge Rehab over I-395
Results
Less than $13,766,000 est. value
VA

Last Updated 06/15/2021 04:06 PM
Project Title

Gilmerton Bridge Auxiliary Counterweight and Other Repairs

Physical Address View project details and contacts
City, State (County) Chesapeake, VA   (Chesapeake City County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results, All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Work under this Project consists of Bridge Rehab no added capacity. Complete redesign and installation of new auxiliary counter weight system on Gilmerton Bridge including a Modification Bridge Skew Control System, and Rope Slip &Tension Adjustment.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents