Similar Projects
Buffalo Zoo - Cooling Tower Replacement
Bidding
Buffalo, NY 14202

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

J--HVAC and Duct Cleaning of Wards 5C, 9A, and OR
Post-Bid
Buffalo, NY 14215

HVAC Equipment_Service and Preventative Maintenance Contract
Results
Buffalo, NY 14207

Replace Heating System
Results
$100,000 to $250,000 est. value
Collins, NY

J--VA Buffalo / Batavia Kitchen Hood Cleaning (VA-19-00026202)
Post-Bid
Batavia, Buffalo, NY 14020

Z--528-18-S61 AC Unit Replacements Lab
Results
$250,000 to $500,000 est. value
Buffalo, NY

Caudell SLP Wing Rooftop Unit Replacement
Post-Bid
Buffalo, NY

J--HVAC Cleaning of Wards 5C and 9A (VA-19-00018526)
Results
Buffalo, NY NY

J--Buffalo and Batavia Kitchen Exhaust Cleaning and Inspections (VA-19-00026202)
Post-Bid
Buffalo, NY

New York State Office of Mental Health Buffalo Psychiatric Center Building 62 Chiller Replacement
Results
$1,425,000 to $1,535,000 est. value
Buffalo, NY 14213

MRC AHU 1-2 Fan Restoration
Renovation
Post-Bid
Buffalo, NY 14263

Removal and Replacement of HVAC Units
Results
Cheektowaga, NY

HVAC & Refrigeration Replacement / Maintenance
Term Contract
Post-Bid

2019 Loguidice and HEWES HVAC and Electrical
Results
Angola, NY 14006

Reported 02/13/2019 12:00 AM
Project Title

Police and Fire Headquarters at Michael J. Dillon Courthouse 5th Floor Chiller Replacement

Physical Address View project details and contacts
City, State (County) Buffalo, NY 14202   (Erie County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description Project Will Include the removal and replacement of a nominal 40 Ton chiller including an indoor mounted evaporator and an exterior roof mounted air cooled condenser, and an associated chilled water pump. Electrical power to the chiller and pump will be disconnected and reconnected to the new equipment. Chilled water piping will be removed and replace as required to accommodate the disconnection and reconnection of the evaporator, and refrigerant piping will be provided between the new chiller evaporator and air cooled condenser. The new chiller and pump will be added to the building existing temperature control system. Existing structural support will be modified to accommodate the new roof mounted equipment.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents