Similar Projects
Reported | 02/13/2019 12:00 AM |
Project Title | Police and Fire Headquarters at Michael J. Dillon Courthouse 5th Floor Chiller Replacement |
Physical Address | View project details and contacts |
City, State (County) | Buffalo, NY 14202 (Erie County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project Will Include the removal and replacement of a nominal 40 Ton chiller including an indoor mounted evaporator and an exterior roof mounted air cooled condenser, and an associated chilled water pump. Electrical power to the chiller and pump will be disconnected and reconnected to the new equipment. Chilled water piping will be removed and replace as required to accommodate the disconnection and reconnection of the evaporator, and refrigerant piping will be provided between the new chiller evaporator and air cooled condenser. The new chiller and pump will be added to the building existing temperature control system. Existing structural support will be modified to accommodate the new roof mounted equipment. | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |