Similar Projects
Reported | 02/01/2019 12:00 AM |
Project Title | Replace HVAC, Buildings TT-2459 & TT-2459A |
Physical Address | View project details and contacts |
City, State (County) | Camp Lejeune, NC (Onslow County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work includes Building TT2459-Demolish the existing roof top heat pumps and ductless split, exhaust fans, enthalpy wheel, and associated equipment. Properly repair/patch any holes in roof as a result of HVAC removal. Provide/install new energy efficient rooftop gas pack units. Provide new roof curbs, thermostats, and ductwork modifications. Properly clean any remaining ductwork. Demolish the existing controls and provide a new DDC system that shall be accessible from the Hospital EMCS (Bacnet MS/TP. Provide/install gravity condensate drains as necessary. Demolish the existing suspended ceiling and supporting grid system. Install a new moisture resistant ceiling and grid system throughout. Any existing gypsum ceilings that are disturbed/damaged as a result of the removal of HVAC equipment shall be properly patched and painted. Remove and replace the existing interior light fixtures with new LED light fixtures. Provide/install LED wall pack lights at each entrance. Modify the electrical system, as necessary, to support the new HVAC system. Building TT2459A-Existing HP-1/AHU-1 (serving office areas) is in good working and shall remain. Rebalance airflow to match current requirements. Replace programmable thermostat with DDC temperature/humidity sensor. Existing HP-2/AHU-2 (serving veterinary area less 103 Surgery) shall be demolished and replaced per the referenced study/AE recommendations. Surgery, room 103, shall receive a separate HVAC system. HVAC system shall satisfy all UFC requirements. Create/construct a small clean room prior to room 103. This area will provide a preoperation preparatory area for the staff to ensure contaminants do not enter the surgery room. Provide the necessary HVAC/controls to obtain the appropriate room pressures. Adjust ceiling/lighting in this area to accommodate the pre-op room. The existing ceilings shall remain. Any existing ceilings damaged by HVAC removal shall be properly addressed (ACT and/or gypsum). Remove and replace the existing interior light fixtures with new LED light fixtures. Provide/install LED wall pack lights at each entrance. Modify the electrical system, as necessary, to support the new HVAC system. The above scope shall be included and incidental related work. | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |