Similar Projects
Replace AHU Bldgs FC365 & RR525 (Proj. 20-0030)
Bidding
$200,000 to $500,000 est. value
Camp Lejeune, NC 28547

Boiler Rope Replacement Jacksonville High School
Bidding
Jacksonville, NC 28540

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

HVAC Contractors to Replace Heat and A/C Systems in Existing Homes
Post-Bid

Replacement Re-Verber-Ray Infrared Radiant Heater for Fire Station 4
Results
Jacksonville, NC

Duct-Less Split Heat Pump - Northeast Creek Splash Pad
Results
Jacksonville, NC 28541

HVAC Contractors to Evaluate, Clean and Tune Residential Heating and Air Conditioning Systems
Post-Bid

Swansboro Elementary School HVAC Replacement
Results
Less than $63,105 est. value
Swansboro, NC 28584

Hood Cleaning and Inspection
Post-Bid
NC

HVAC for Storage Building
Results
Less than $6,480 est. value
Jacksonville, NC

Diesel Exhaust System - Town of Swansboro Fire Department
Post-Bid
Swansboro, NC 28584

Ellis Waste Water Lift Station HVAC Replacements
Results
Less than $12,994 est. value
Jacksonville, NC

AS4040 HVAC Package Unit Replacement
Post-Bid
$250,000 to $500,000 est. value
Camp Lejeune, NC 28547

Jack Amyette Recreation Center Duct Work
Results
Less than $8,900 est. value
Jacksonville, NC

City Hall HVAC Replacement
Results
Less than $553,350 est. value
Jacksonville, NC

Reported 02/01/2019 12:00 AM
Project Title

Replace HVAC, Buildings TT-2459 & TT-2459A

Physical Address View project details and contacts
City, State (County) Camp Lejeune, NC   (Onslow County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The work includes Building TT2459-Demolish the existing roof top heat pumps and ductless split, exhaust fans, enthalpy wheel, and associated equipment. Properly repair/patch any holes in roof as a result of HVAC removal. Provide/install new energy efficient rooftop gas pack units. Provide new roof curbs, thermostats, and ductwork modifications. Properly clean any remaining ductwork. Demolish the existing controls and provide a new DDC system that shall be accessible from the Hospital EMCS (Bacnet MS/TP. Provide/install gravity condensate drains as necessary. Demolish the existing suspended ceiling and supporting grid system. Install a new moisture resistant ceiling and grid system throughout. Any existing gypsum ceilings that are disturbed/damaged as a result of the removal of HVAC equipment shall be properly patched and painted. Remove and replace the existing interior light fixtures with new LED light fixtures. Provide/install LED wall pack lights at each entrance. Modify the electrical system, as necessary, to support the new HVAC system. Building TT2459A-Existing HP-1/AHU-1 (serving office areas) is in good working and shall remain. Rebalance airflow to match current requirements. Replace programmable thermostat with DDC temperature/humidity sensor. Existing HP-2/AHU-2 (serving veterinary area less 103 Surgery) shall be demolished and replaced per the referenced study/AE recommendations. Surgery, room 103, shall receive a separate HVAC system. HVAC system shall satisfy all UFC requirements. Create/construct a small clean room prior to room 103. This area will provide a preoperation preparatory area for the staff to ensure contaminants do not enter the surgery room. Provide the necessary HVAC/controls to obtain the appropriate room pressures. Adjust ceiling/lighting in this area to accommodate the pre-op room. The existing ceilings shall remain. Any existing ceilings damaged by HVAC removal shall be properly addressed (ACT and/or gypsum). Remove and replace the existing interior light fixtures with new LED light fixtures. Provide/install LED wall pack lights at each entrance. Modify the electrical system, as necessary, to support the new HVAC system. The above scope shall be included and incidental related work.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents