Similar Projects
Last Updated | 08/03/2022 07:04 AM |
Project Title | Francis Harris Lane - Low Water Crossing |
Physical Address | View project details and contacts |
City, State (County) | San Marcos, TX 78666 (Hays County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $691,902 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The proposed project will improve the existing low water crossing at Francis Harris Lane over York Creek, replacing the existing two 15-inch diameter corrugated metal pipes with five 8-foot x 4-foot boxes. The project includes new safety guard rails and streambank stabilization. The existing roadway width of approximately 24-feet will be widened to 32-feet and will improve approximately 365 feet of roadway. The project also includes approximately 212 linear feet of guard rail installation along the pavement edge for traffic protection. Drainage improvements include new culvert and slope protection. Upon completion of the project all disturbed areas shall be revegetated. The improvements will significantly reduce overtopping of the road and lower the flooding elevation upstream of the crossing. Bid Bond: 5% of total bid amount due at bid submittal Performance and Payment Bond: 100% of Contract Price within 10 days of contract award. Hays County reserves the right to accept or reject any and all submittals as it shall deem to be in the best interest of Hays County. Question Deadline 07/20/2022 at 5:00 PM CT |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |