Project Title | DFCM Construction-Pre-Qual Mechanical & General CONTR-Old Stadium Swing Space & MEP |
Physical Address | View project details and contacts |
City, State (County) | Salt Lake City, UT 84111 (Salt Lake County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | College/University, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected January 2024 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $4,514,681 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of July 6, 2023 the project bids were over the budget. The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the construction of the following project: WSU Old Stadium Swing Space and MEP Upgrade Weber State University Weber State University, Ogden Campus DFCM PROJECT #23025810 Project Description: Upgrade mechanical and plumbing systems throughout the old stadium and sky suites as well as electrical to support the new HVAC system. This upgrade includes changing the HVAC system from VAV air handling system with reheat boxes to a VRF system. This includes both water source and air source units. There is also a portion of the scope to reconfigure one of the existing locker rooms to be flexible office space for the University to use. Construction Cost Estimate: $2,700,000.00 Question Submission Close Date 5/19/2023 3:00 PM MDT Scope 1.Furnish all labor, materials, and equipment necessary for the completion of the mechanical and plumbing scope of work. 2. Furnish and install all motors specified in this Division and be responsible for the proper operation of electrical powered equipment furnished by this Division. 3. Furnish exact location of electrical connections and information on motor controls to Division 26. 4. Mechanical Contractor shall obtain the services of independent Test and Balance Agency. 5. Placing the air conditioning, heating, ventilating, and exhaust systems into full operation and continuing their operation during each working day of testing and balancing. 6. Making changes in pulleys, belts, and dampers, or adding dampers, as required for the correct balance as recommended by Balancing Contractor at no additional cost to Owner. 7. Air balance, final adjustment and test run |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |