Similar Projects
Ice Rink and North Park Center Window and Door Replacement Project
Renovation
Sub-Bidding
$200,000 CJ est. value
Franklin Park, IL 60131

Overhead Door Maintenance at Various Service Areas
Term Contract
Sub-Bidding
$485,000 CJ est. value
Chicago, IL 60604

Heavy Duty Tents
Alteration
Post-Bid
Palos Hills, Tinley Park, IL 60465

Board Up Services
Term Contract
Post-Bid
Chicago, IL

Door Installations
Results
Palatine, IL

High Performance Overhead Doors at 4 Pace Divisions
Term Contract
Results
Bridgeview, Evanston, Joliet, Waukegan, IL 60433

Todd Hall and Rutledge Hall Window Treatments
Renovation
Sub-Bidding
$589,000 CJ est. value
Lincolnwood, IL 60712

Door and Door Hardware
Term Contract
Post-Bid
Chicago, IL

Z2dz--Awning and Acrylic Windows Replacement
Term Contract
Results
Chicago, IL

Door Project at Oakwood School
Renovation
Sub-Bidding
$55,000 CJ est. value
Lemont, IL 60439

Windows
Alteration
Post-Bid
Less than $25,000 est. value
Maywood, IL 60153

Now Arena Commercial Pedestrian Door Replacements
Alteration
Results
Hoffman Estates, IL

Site Wide Door Repair Service Contract
Term Contract
Sub-Bidding
Lemont, IL 60439

Plastic Access Panel Doors
Alteration
Post-Bid
Chicago, IL

Sullivan Center Accordion Door Replacement
Alteration
Results
Palatine, IL

Last Updated 03/01/2023 12:47 PM
Project Title

2023 Door Replacement Work

Physical Address View project details and contacts
City, State (County) Westchester, IL 60154   (Cook County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $124,985 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Each Bid Must Be Accompanied by a Bid Guarantee in the Form of a Bid Bond, Certified Check or Bank Draft in an Amount Equal to and Not Less Than Ten Percent (10%) of the Bid and Made Payable to the Board of Education, Westchester School District 92.5, Westchester, Il. No Bid Shall Be Withdrawn for a Period of Sixty (60) Days After the Bid Opening Date Without the Consent of the Owner. Checks or Drafts of Unsuccessful Bidders Will Be Returned as Soon as Practical, After Opening and Checking the Bids. Successful Bidder Must Provide a Performance Bond and a Labor and Material Payment Bond in the Full Amount of the Contract, Acceptable to the Owner. The Board of Education Reserves the Right to Reject Any or All Bids or Parts Thereof or Waive Any Irregularities or in-formalities in Bidding. This Contract is Subject to the Illinois Prevailing Wage Act (820 Ilcs 130/1 Et Seq.). Qualification: Each Bidder Must Satisfactorily Complete the Qualification Process Described in Section 004395 -general Requirements of the Project Manual, by Providing the Required Qualification Documents. The Project consists of exterior door replacement and interior door/frame/keying replacement at Westchester Intermediate School for Westchester School District 92.5, 9981 Canterbury Street, Westchester, IL, hereafter called the Owner, and is to be constructed in accordance with the Contract Documents prepared by StudioGC, dated January 27, 2023. B. Scope: The Work includes the work of all trades required; and all the labor, materials, and equipment necessary and incidental to the construction and completion of the Work. C. Work to be executed under one General Contract, including all trades.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents