Similar Projects
Heating Ventilation Air Conditioning Mitsubishi System Installation
Bidding
Frederick, MD 21701

Replace Chemical Fume Hoods
Bidding
$250,000 to $500,000 est. value
Frederick, MD 21701

Frederick Duct Cleaning
Term Contract
Post-Bid
Less than $50,000 est. value
Frederick, MD 21701

Remove Existing Chillers at Building 322 and Tie Into the New Campus Chilled Water Loop
Post-Bid
Frederick, MD

Modify Roof Exhaust Stacks and Attic Exhaust Ductwork in Building 560
Results
Frederick, MD

Campus Steam and Condensate Lines
Results
Fort Detrick, MD

Tie-In Chiller Plant #2 Into The New Campus Chilled Water Loop
Post-Bid
Frederick, MD

Redundant Chiller, ATRF
Results
Frederick, MD 21701

Talley Recreation Center HVAC Maintenance
Term Contract
Post-Bid
Frederick, MD 21701

B1049 HVAC Upgrades
Results
Frederick, MD

Z--HVAC Repair Building 1422
Post-Bid
Fort Detrick, MD

HVAC Improvements at Lincoln, Carver and Catoctin Manor Apartments
Results
Frederick, MD 21701

HVAC and Mechanical Equipment Preventative Maintenance and Repair Frederick Readiness Center
Term Contract
Post-Bid
Less than $50,000 est. value
Frederick, MD 21701

Weatherization Services
Results
Frederick, MD

Countywide Heating Ventilation and Air Conditioning Maintenance Services
Term Contract
Post-Bid
MD

Last Updated 11/09/2020 02:12 PM
Project Title

Replace Supply Air Handling Units

Physical Address View project details and contacts
City, State (County) Frederick, MD   (Frederick County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall furnish all labor, materials, supervision, and equipment for the replacement of supply air handling units (SAHU) in Buildings 1023, 1036, 1037 and 1048. This project will be completed in three (3) Phases. Phase 1 is Buildings 1023 and 1048. Phase 2 is Building 1037 and Phase 3 is Building 1036.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents